ASSESSMENT OF TUE FACTORS MITIGATING THE EFFECTIVE PREPARATION OF COST ESTIMATE AT TILE DESIGN STAGE

 

Table Of Contents


  • Cover page Title page Certification Dedication Acknowledgement Abstract Organization of the work Table of Content

Thesis Abstract

This research assesses the factors mitigating the effective preparation of cost estimates at the design stage Accurate cost estimates are crucial to the effrctive realization of construction projects. This research is aimed at examining the factors affecting accuracy of pre-lender cost estimate in Abuja, with a view to improving the predictive ability of clients, consultants, and contractors for better estimating. 84 questionnaires were sent out, 28 to con tractors, 28 to clients, and 28 were sent to the consultant firms respectively. 25 questionnaires were received from each of the respondent categories, representing 89% using the simple random sampling technique The collected data were analyzed using the Relative importance Index. The study found out that a statistically significant relationship existed between the clients, consultants, and contractor on the essential factors affecting accuracy of pre-tender cost estimate. It was concluded that Experience and skill level of the consultants ranked f’ with overall Ru of 0.9, project teams experience on the construction type 0.87, clear and detail drawings and specification, completeness of cost information, accuracy and reliability of cost information are the most significant factors affecting accuracy of pre-tender cost estimate were other paramount factors. The most appropriate cost estimating method at the design stage according to the respondents ranking is subjective estimating with Ru of 0.78 and parametric estimating 0.46 and synthetic estimating 0.52. It was recommended that Clients should always engage the services of skilled quantity surveyors to undertake the consultancy services in cost estimating process.

Thesis Overview

INTRODUCTION1.1 Background of the StudyConstruction estimate is the amount envisages to finish a construction work. It is the probable amount that is computed to complete a construction work. It is the prediction of the amount of a project based on available data at the time of prediction.Cost estimate was defined by business dictionary (2013) as an “approximation of the probable cost of a product, program, or project, computed on the basis of available information. So the more information is provided on a project, the more the estimate tends to accuracy. It is important in many ways. According to business dictionary (2013), “four common types of cost estimates are: Planning estimate is a rough approximation of cost within a reasonable range of values, prepared for information purposes only, budget estimate an approximation based on well-defined ground rules, firm estimate a figure based on cost data that is renewable enough for entering into a binding concrete, not-to- exceed/Not-less-than estimate the maximum or minimum amount required to accomplish a given task, based on firm cost estimate. There are more benefits in estimating the cost of a potential construction Job that is not estimating before commencement. Cost estimate, to a client, is necessary in cash flow management. To an investor, it is necessary to support evaluation of project feasibility and to assess the scope of work. To a consultant, construction cost estimate can serve as a basis for job performance measurement (Baccarini 2004), in contract or selection, as an exhibit in construction contract disagreement, and in post work evaluation of completed jobs (work audit), and to a contractor, it is the determinant ofjob procurement (in bidding for construction jobs).1.2 Statement of the ProblemThe demand for more construction of all type coupled with tight monetary supply has provided the construction industry with, a big challenge on how to estimate the cost of construction project.The problem of late involvement of quantity surveyor, inadequate details in the contract document, poor communication between the design team, inaccurate drawing and specification, inadequate data, unavailability of current rates of construction resources, inflation and charming in technology, finally consequent loss of project has brought about loss of client confidence in consultants, added investment risk, inability to deliver value to clients and disinvestment in the construction industry. As a result of this, it is found necessary to create solution to such problems through this research as to improve on the quality of the factors that affect the preparation of the cost estimate at the design stage.1.3 Aim and Objectives of the Study1.3.1 AimThe aim of this research is to assess the factors that mitigate the effective preparation of cost estimate at the design stage.1.3.2 ObjectivesThe specific objective of this research are:
  1. To examine the factors that mitigates the accuracy of pre-lender preparation or cost estimate at tne design stage.
  2. To determine the appropriate method of cost estimating at the design stage
  3. To access the factors that mitigates the effective preparation of cost estimate at the design stage.
1.4 Significance of the StudyThe significance of this research is to promote good estimating to sustained profit as errors and carelessness can be costly in terms of loss of profit and project abandonment,1.5 ScopeThis research focused on the cost estimate at the design stage of public building project within Federal Capital Territory Abuja.1.6 LimitationIn this process of this research project, there were various forms of setbacks which had a great effect on the process of this research project.One of such set back is the inability to get the appropriate and reliable information and it book found from librarian visited, also the high cost of transportation to the various information centers visited and place where the questionnaire where given out, as well the reluctance shown by these whom the questionnaires were given to.Despite all this, a reasonable amount of work was achieved based on the research topic.

Blazingprojects Mobile App

📚 Over 50,000 Research Thesis
📱 100% Offline: No internet needed
📝 Over 98 Departments
🔍 Thesis-to-Journal Publication
🎓 Undergraduate/Postgraduate Thesis
📥 Instant Whatsapp/Email Delivery

Blazingprojects App

Related Research

Petroleum engineerin. 4 min read

A unified Framework for Multiscale Pore-Scale-to-Field Reservoir Forecasting...

This research develops a unified framework that links pore-scale processes to field-scale reservoir performance, enabling more accurate forecasts of oil and gas...

BP
Blazingprojects
Read more →
International relati. 3 min read

A Global Expectation Framework for Strategic Diplomacy under Multipolarity...

This research explores how global leaders and major powers coordinate diplomatic behavior in a world where power is distributed among several influential region...

BP
Blazingprojects
Read more →
Industrial chemistry. 2 min read

A Framework for Circularity-Oriented Catalytic Process Design in Industry...

This research explores how catalytic processes in industry can be redesigned to support circular economy principles, reducing waste, conserving resources, and e...

BP
Blazingprojects
Read more →
Human resource manag. 4 min read

A Dynamic Resilience-Based Framework for HR Transformation and Outcomes...

This research explores how organizations can make HR practices more resilient and dynamic in the face of rapid changes such as technology disruption, demographi...

BP
Blazingprojects
Read more →
Home and rural econo. 3 min read

A Farm-Province Adaptive Resilience Framework for Rural Households...

This research investigates how rural households connected to both farming and provincial markets build resilience to shocks and stresses. It addresses the gap b...

BP
Blazingprojects
Read more →
Geo-science. 3 min read

A Framework for Integrating Isotopic Signatures in Sedimentary Basin Thermochronolog...

This research explores how isotopic signatures can be integrated into thermochronology studies of sedimentary basins to better understand their thermal historie...

BP
Blazingprojects
Read more →
French. 3 min read

Cadre théorique pour l’évaluation éthique des IA en entreprise ...

This research explores how to build and apply a theoretical framework for evaluating the ethics of artificial intelligence (AI) used in business settings. It as...

BP
Blazingprojects
Read more →
Environmental scienc. 4 min read

A Resilience-Framing Framework for Urban Water–Energy–Waste Nexus Governance...

The research topic explores how cities can manage the interconnected systems of water, energy, and waste more effectively by using a resilience-framing framewor...

BP
Blazingprojects
Read more →
Environmental manage. 2 min read

A Resilience-Framing Framework for Urban Environmental Management Systems...

This research explores a resilience-framing framework for urban environmental management systems, focusing on how cities plan for, respond to, and learn from en...

BP
Blazingprojects
Read more →
WhatsApp Click here to chat with us