Analysis of Cost Overruns in Construction Projects: A Case Study of Residential High-rise Buildings

 

Table Of Contents


Chapter ONE

INTRODUCTION

  • 1.1Introduction
  • 1.2Background of Study
  • 1.3Problem Statement
  • 1.4Objectives of Study
  • 1.5Limitations of Study
  • 1.6Scope of Study
  • 1.7Significance of Study
  • 1.8Structure of the Thesis
  • 1.9Definition of Terms

Chapter TWO

LITERATURE REVIEW

  • 2.1Review of Cost Overruns in Construction Projects
  • 2.2Factors Contributing to Cost Overruns
  • 2.3Strategies for Cost Control in Construction Projects
  • 2.4Previous Studies on Cost Overruns in High-rise Buildings
  • 2.5The Role of Quantity Surveyors in Cost Management
  • 2.6Technology and Innovation in Cost Estimation
  • 2.7Best Practices in Quantity Surveying for Cost Control
  • 2.8Risk Management in Construction Projects
  • 2.9Sustainable Cost Management Practices
  • 2.10Benchmarking Cost Performance in Construction

Chapter THREE

RESEARCH METHODOLOGY

  • 3.1Research Design
  • 3.2Sampling Technique
  • 3.3Data Collection Methods
  • 3.4Data Analysis Techniques
  • 3.5Questionnaire Design
  • 3.6Case Study Selection
  • 3.7Ethical Considerations
  • 3.8Validity and Reliability of Data

Chapter FOUR

DATA PRESENTATION AND ANALYSIS

  • Discussion of Findings
  • 4.1Overview of Data Collected
  • 4.2Analysis of Cost Overruns in Residential High-rise Buildings
  • 4.3Comparison of Findings with Literature Review
  • 4.4Implications of Findings for Quantity Surveying Practice
  • 4.5Recommendations for Cost Control in Construction Projects

Chapter FIVE

SUMMARY, CONCLUSION AND RECOMMENDATIONS

  • and Summary
  • 5.1Summary of Findings
  • 5.2Conclusion
  • 5.3Contributions to Quantity Surveying Field
  • 5.4Implications for Future Research
  • 5.5Final Remarks

Thesis Abstract

Abstract
This thesis investigates the prevalent issue of cost overruns in construction projects, focusing specifically on residential high-rise buildings. The aim of the study is to identify the causes of cost overruns in such projects and propose strategies for mitigating them. The research methodology employed includes a comprehensive literature review, data collection through surveys and interviews, and data analysis using statistical tools. Chapter One provides an introduction to the research topic, outlining the background, problem statement, objectives, limitations, scope, significance of the study, structure of the thesis, and definition of key terms. Chapter Two presents a detailed literature review on cost overruns in construction projects, covering ten key aspects such as risk factors, project management practices, and cost estimation techniques. Chapter Three describes the research methodology used in the study, including the research design, data collection methods, sample selection, data analysis techniques, and ethical considerations. The chapter also discusses the limitations of the study and the measures taken to address them. Chapter Four presents an in-depth analysis of the research findings, highlighting the key causes of cost overruns in residential high-rise construction projects. The chapter also discusses the strategies proposed to mitigate these cost overruns, drawing on both the literature review and the empirical data collected. Finally, Chapter Five offers a conclusion and summary of the thesis, summarizing the key findings, discussing their implications, and providing recommendations for future research and practice. Overall, this thesis contributes to the existing body of knowledge on cost overruns in construction projects and provides valuable insights for project stakeholders to enhance cost management practices in residential high-rise building construction.

Thesis Overview

Blazingprojects Mobile App

📚 Over 50,000 Research Thesis
📱 100% Offline: No internet needed
📝 Over 98 Departments
🔍 Thesis-to-Journal Publication
🎓 Undergraduate/Postgraduate Thesis
📥 Instant Whatsapp/Email Delivery

Blazingprojects App

Related Research

Petroleum engineerin. 2 min read

A unified Framework for Multiscale Pore-Scale-to-Field Reservoir Forecasting...

This research develops a unified framework that links pore-scale processes to field-scale reservoir performance, enabling more accurate forecasts of oil and gas...

BP
Blazingprojects
Read more →
International relati. 2 min read

A Global Expectation Framework for Strategic Diplomacy under Multipolarity...

This research explores how global leaders and major powers coordinate diplomatic behavior in a world where power is distributed among several influential region...

BP
Blazingprojects
Read more →
Industrial chemistry. 4 min read

A Framework for Circularity-Oriented Catalytic Process Design in Industry...

This research explores how catalytic processes in industry can be redesigned to support circular economy principles, reducing waste, conserving resources, and e...

BP
Blazingprojects
Read more →
Human resource manag. 2 min read

A Dynamic Resilience-Based Framework for HR Transformation and Outcomes...

This research explores how organizations can make HR practices more resilient and dynamic in the face of rapid changes such as technology disruption, demographi...

BP
Blazingprojects
Read more →
Home and rural econo. 3 min read

A Farm-Province Adaptive Resilience Framework for Rural Households...

This research investigates how rural households connected to both farming and provincial markets build resilience to shocks and stresses. It addresses the gap b...

BP
Blazingprojects
Read more →
Geo-science. 4 min read

A Framework for Integrating Isotopic Signatures in Sedimentary Basin Thermochronolog...

This research explores how isotopic signatures can be integrated into thermochronology studies of sedimentary basins to better understand their thermal historie...

BP
Blazingprojects
Read more →
French. 4 min read

Cadre théorique pour l’évaluation éthique des IA en entreprise ...

This research explores how to build and apply a theoretical framework for evaluating the ethics of artificial intelligence (AI) used in business settings. It as...

BP
Blazingprojects
Read more →
Environmental scienc. 2 min read

A Resilience-Framing Framework for Urban Water–Energy–Waste Nexus Governance...

The research topic explores how cities can manage the interconnected systems of water, energy, and waste more effectively by using a resilience-framing framewor...

BP
Blazingprojects
Read more →
Environmental manage. 3 min read

A Resilience-Framing Framework for Urban Environmental Management Systems...

This research explores a resilience-framing framework for urban environmental management systems, focusing on how cities plan for, respond to, and learn from en...

BP
Blazingprojects
Read more →
WhatsApp Click here to chat with us