Analysis of Cost Overruns in Construction Projects: A Case Study Approach in Quantity Surveying

 

Table Of Contents


Chapter ONE

INTRODUCTION

  • 1.1Introduction
  • 1.2Background of Study
  • 1.3Problem Statement
  • 1.4Objective of Study
  • 1.5Limitation of Study
  • 1.6Scope of Study
  • 1.7Significance of Study
  • 1.8Structure of the Thesis
  • 1.9Definition of Terms

Chapter TWO

LITERATURE REVIEW

  • 2.1Overview of Cost Overruns in Construction Projects
  • 2.2Causes of Cost Overruns
  • 2.3Effects of Cost Overruns
  • 2.4Cost Control Strategies in Quantity Surveying
  • 2.5Previous Studies on Cost Overruns
  • 2.6The Role of Quantity Surveyors in Cost Management
  • 2.7Cost Estimation Techniques
  • 2.8Project Risk Management
  • 2.9Cost Monitoring and Reporting
  • 2.10Best Practices in Cost Management

Chapter THREE

RESEARCH METHODOLOGY

  • 3.1Research Design
  • 3.2Sampling Methods
  • 3.3Data Collection Techniques
  • 3.4Data Analysis Methods
  • 3.5Research Instrumentation
  • 3.6Ethical Considerations
  • 3.7Validity and Reliability
  • 3.8Limitations of the Methodology

Chapter FOUR

DATA PRESENTATION AND ANALYSIS

  • Discussion of Findings
  • 4.1Overview of Research Findings
  • 4.2Analysis of Cost Overruns in Case Studies
  • 4.3Comparison of Findings with Existing Literature
  • 4.4Implications of Findings
  • 4.5Recommendations for Practice
  • 4.6Suggestions for Future Research

Chapter FIVE

SUMMARY, CONCLUSION AND RECOMMENDATIONS

  • and Summary
  • 5.1Summary of Findings
  • 5.2Conclusions
  • 5.3Contributions to Knowledge
  • 5.4Practical Implications
  • 5.5Recommendations for Stakeholders
  • 5.6Conclusion and Final Remarks

Thesis Abstract

Abstract
Construction projects are often plagued by cost overruns, which can have significant negative impacts on project outcomes. This study aims to analyze the factors contributing to cost overruns in construction projects from a quantity surveying perspective. Through a case study approach, this research investigates the causes of cost overruns, their implications, and potential mitigation strategies. The research begins with an introduction to the problem of cost overruns in construction projects, highlighting the importance of addressing this issue to improve project performance. The background of the study provides context on the prevalence of cost overruns in the construction industry and the need for effective cost management practices. The problem statement identifies the research gap in understanding the specific factors leading to cost overruns in construction projects. The objectives of the study include identifying the key factors contributing to cost overruns, examining their impact on project outcomes, and proposing recommendations for mitigating cost overruns. The limitations of the study acknowledge the potential constraints on data availability, project scope, and generalizability of findings. The scope of the study outlines the specific focus on construction projects and quantity surveying practices. The significance of the study lies in its potential to inform industry stakeholders, project managers, and quantity surveyors about the causes and consequences of cost overruns, enabling them to make informed decisions and improve project performance. The structure of the thesis provides an overview of the chapters and their contents, guiding readers through the research process. Definitions of key terms are provided to clarify terminology used throughout the thesis. Chapter Two presents a comprehensive literature review, examining existing research on cost overruns in construction projects, quantity surveying practices, and cost management strategies. The review of literature synthesizes key findings and identifies gaps in current knowledge, providing a foundation for the research study. Chapter Three outlines the research methodology, including the research design, data collection methods, sampling strategy, and data analysis techniques. The chapter details the case study approach used to investigate cost overruns in construction projects, ensuring a rigorous and systematic research process. Chapter Four presents the findings of the study, analyzing the factors contributing to cost overruns, their implications on project outcomes, and potential mitigation strategies. The discussion of findings highlights key insights and recommendations for addressing cost overruns in construction projects. Chapter Five concludes the thesis by summarizing the key findings, implications for practice, and recommendations for future research. The conclusion highlights the significance of the study in advancing knowledge on cost overruns in construction projects and emphasizes the importance of effective cost management practices in improving project outcomes. In conclusion, this thesis contributes to the existing body of knowledge on cost overruns in construction projects by providing a detailed analysis of the factors contributing to cost overruns from a quantity surveying perspective. The findings of this study have implications for industry practice, highlighting the importance of proactive cost management strategies to mitigate cost overruns and improve project performance.

Thesis Overview

The project titled "Analysis of Cost Overruns in Construction Projects: A Case Study Approach in Quantity Surveying" aims to investigate the factors contributing to cost overruns in construction projects from a Quantity Surveying perspective. Cost overruns are common in the construction industry and can have significant impacts on project outcomes, including delays, disputes, and financial losses. By focusing on this issue, the research seeks to provide valuable insights that can help improve cost estimation practices and project management strategies in the construction sector. This study will adopt a case study approach, which involves analyzing real-world construction projects to identify the root causes of cost overruns. The research will draw on both quantitative and qualitative data to gain a comprehensive understanding of the factors influencing project costs. Quantitative data analysis will involve examining project budgets, actual expenditures, and cost variations, while qualitative data analysis will involve interviews with key stakeholders such as project managers, contractors, and Quantity Surveyors. The research overview will be structured around several key components, including the introduction, literature review, research methodology, findings discussion, and conclusion. The introduction will provide an overview of the research problem, objectives, significance, scope, and structure of the thesis. The literature review will explore existing studies on cost overruns in construction projects, highlighting common causes and potential solutions identified in the literature. The research methodology section will outline the research design, data collection methods, and data analysis techniques used in the study. This section will also discuss the selection criteria for the case studies and the ethical considerations involved in the research process. The findings discussion will present the results of the data analysis, highlighting the key factors contributing to cost overruns in the case study projects. This section will also compare the findings with existing literature and discuss their implications for Quantity Surveying practice. In conclusion, this research overview sets the stage for a comprehensive investigation into cost overruns in construction projects from a Quantity Surveying perspective. By examining real-world case studies and engaging with industry stakeholders, the study aims to provide practical recommendations for improving cost estimation accuracy and project management effectiveness. Ultimately, this research seeks to contribute to the body of knowledge in Quantity Surveying and help address the challenges associated with cost overruns in the construction industry.

Blazingprojects Mobile App

📚 Over 50,000 Research Thesis
📱 100% Offline: No internet needed
📝 Over 98 Departments
🔍 Thesis-to-Journal Publication
🎓 Undergraduate/Postgraduate Thesis
📥 Instant Whatsapp/Email Delivery

Blazingprojects App

Related Research

Petroleum engineerin. 3 min read

A unified Framework for Multiscale Pore-Scale-to-Field Reservoir Forecasting...

This research develops a unified framework that links pore-scale processes to field-scale reservoir performance, enabling more accurate forecasts of oil and gas...

BP
Blazingprojects
Read more →
International relati. 2 min read

A Global Expectation Framework for Strategic Diplomacy under Multipolarity...

This research explores how global leaders and major powers coordinate diplomatic behavior in a world where power is distributed among several influential region...

BP
Blazingprojects
Read more →
Industrial chemistry. 3 min read

A Framework for Circularity-Oriented Catalytic Process Design in Industry...

This research explores how catalytic processes in industry can be redesigned to support circular economy principles, reducing waste, conserving resources, and e...

BP
Blazingprojects
Read more →
Human resource manag. 4 min read

A Dynamic Resilience-Based Framework for HR Transformation and Outcomes...

This research explores how organizations can make HR practices more resilient and dynamic in the face of rapid changes such as technology disruption, demographi...

BP
Blazingprojects
Read more →
Home and rural econo. 3 min read

A Farm-Province Adaptive Resilience Framework for Rural Households...

This research investigates how rural households connected to both farming and provincial markets build resilience to shocks and stresses. It addresses the gap b...

BP
Blazingprojects
Read more →
Geo-science. 3 min read

A Framework for Integrating Isotopic Signatures in Sedimentary Basin Thermochronolog...

This research explores how isotopic signatures can be integrated into thermochronology studies of sedimentary basins to better understand their thermal historie...

BP
Blazingprojects
Read more →
French. 2 min read

Cadre théorique pour l’évaluation éthique des IA en entreprise ...

This research explores how to build and apply a theoretical framework for evaluating the ethics of artificial intelligence (AI) used in business settings. It as...

BP
Blazingprojects
Read more →
Environmental scienc. 3 min read

A Resilience-Framing Framework for Urban Water–Energy–Waste Nexus Governance...

The research topic explores how cities can manage the interconnected systems of water, energy, and waste more effectively by using a resilience-framing framewor...

BP
Blazingprojects
Read more →
Environmental manage. 2 min read

A Resilience-Framing Framework for Urban Environmental Management Systems...

This research explores a resilience-framing framework for urban environmental management systems, focusing on how cities plan for, respond to, and learn from en...

BP
Blazingprojects
Read more →
WhatsApp Click here to chat with us