Analysis of Cost Overruns in Construction Projects: A Case Study Approach in Quantity Surveying

 

Table Of Contents


Chapter ONE

INTRODUCTION

  • 1.1Introduction
  • 1.2Background of Study
  • 1.3Problem Statement
  • 1.4Objective of Study
  • 1.5Limitation of Study
  • 1.6Scope of Study
  • 1.7Significance of Study
  • 1.8Structure of the Thesis
  • 1.9Definition of Terms

Chapter TWO

LITERATURE REVIEW

  • 2.1Overview of Cost Overruns in Construction Projects
  • 2.2Factors Contributing to Cost Overruns
  • 2.3Impact of Cost Overruns on Construction Industry
  • 2.4Cost Control Techniques in Quantity Surveying
  • 2.5Best Practices in Cost Management
  • 2.6Case Studies on Cost Overruns
  • 2.7Cost Estimation Methods
  • 2.8Risk Management in Construction Projects
  • 2.9Technology Applications in Quantity Surveying
  • 2.10Current Trends in Quantity Surveying

Chapter THREE

RESEARCH METHODOLOGY

  • 3.1Research Design
  • 3.2Sampling Techniques
  • 3.3Data Collection Methods
  • 3.4Data Analysis Techniques
  • 3.5Research Instruments
  • 3.6Ethical Considerations
  • 3.7Pilot Study
  • 3.8Validity and Reliability

Chapter FOUR

DATA PRESENTATION AND ANALYSIS

  • Discussion of Findings
  • 4.1Analysis of Cost Overruns in Selected Construction Projects
  • 4.2Comparison of Actual Costs vs. Estimated Costs
  • 4.3Identification of Key Factors Contributing to Cost Overruns
  • 4.4Evaluation of Cost Control Strategies
  • 4.5Recommendations for Cost Management Improvement

Chapter FIVE

SUMMARY, CONCLUSION AND RECOMMENDATIONS

  • and Summary
  • 5.1Summary of Findings
  • 5.2Conclusions
  • 5.3Implications for Quantity Surveying Practice
  • 5.4Recommendations for Future Research
  • 5.5Conclusion

Thesis Abstract

Abstract
This thesis investigates the critical issue of cost overruns in construction projects from a quantity surveying perspective, utilizing a case study approach to analyze the factors contributing to cost overruns and propose effective mitigation strategies. The study aims to enhance the understanding of cost estimation and management in construction projects to minimize the occurrence of cost overruns. The research begins with a comprehensive review of relevant literature on cost overruns in construction projects, highlighting the various factors that commonly lead to cost overruns and the challenges faced by quantity surveyors in managing project costs effectively. Through a critical analysis of existing studies and theories, this research aims to provide a solid foundation for the investigation of cost overruns in construction projects. Using a case study methodology, the research will examine real-life construction projects to identify the specific causes of cost overruns and assess the impact of these overruns on project outcomes. By analyzing multiple case studies, the research aims to identify common patterns and trends in cost overruns, enabling a deeper understanding of the underlying issues and challenges faced by quantity surveyors in managing project costs. The research methodology involves a combination of qualitative and quantitative data collection methods, including interviews with project stakeholders, analysis of project documentation, and statistical analysis of cost data. By triangulating data from multiple sources, the research aims to provide a comprehensive and robust analysis of cost overruns in construction projects. The findings of the research will be presented and discussed in detail, highlighting the key factors contributing to cost overruns and the implications for project management practices in the construction industry. The research will also propose a set of practical recommendations and strategies for mitigating cost overruns based on the identified factors and best practices in quantity surveying. In conclusion, this thesis contributes to the existing body of knowledge on cost overruns in construction projects by providing a detailed analysis of the factors contributing to cost overruns and proposing effective strategies for cost management. The research aims to enhance the capacity of quantity surveyors and project managers to anticipate and address cost overruns proactively, ultimately leading to improved project outcomes and client satisfaction in the construction industry.

Thesis Overview

The project titled "Analysis of Cost Overruns in Construction Projects: A Case Study Approach in Quantity Surveying" aims to investigate the factors contributing to cost overruns in construction projects from the perspective of quantity surveying. Cost overruns are a common issue in the construction industry and can have significant implications on project success, profitability, and stakeholder satisfaction. Therefore, understanding the root causes of cost overruns is crucial for effective project management and cost control. This research will utilize a case study approach to analyze real-life construction projects and identify the key factors that lead to cost overruns. By focusing on the role of quantity surveyors in cost estimation, cost control, and project management, the study aims to provide valuable insights into how these professionals can contribute to mitigating cost overruns and improving project outcomes. The research overview will involve a comprehensive review of relevant literature on cost overruns in construction projects, quantity surveying practices, and project management principles. By synthesizing existing knowledge and incorporating insights from industry experts, the study will develop a conceptual framework to guide the analysis of cost overrun factors in construction projects. Through interviews, surveys, and data analysis, the research will explore the experiences and perspectives of quantity surveyors, project managers, and other stakeholders involved in construction projects. By examining multiple case studies, the study will identify common trends, challenges, and best practices related to cost estimation, budgeting, procurement, and risk management in construction projects. The findings of this research are expected to contribute to the body of knowledge in quantity surveying, project management, and construction economics. By highlighting the importance of accurate cost estimation, proactive risk management, and effective communication among project stakeholders, the study aims to provide practical recommendations for improving cost control and minimizing cost overruns in construction projects. Overall, the project "Analysis of Cost Overruns in Construction Projects: A Case Study Approach in Quantity Surveying" seeks to enhance understanding of the complex factors influencing project costs and to support the development of strategies for achieving more successful and sustainable construction outcomes.

Blazingprojects Mobile App

📚 Over 50,000 Research Thesis
📱 100% Offline: No internet needed
📝 Over 98 Departments
🔍 Thesis-to-Journal Publication
🎓 Undergraduate/Postgraduate Thesis
📥 Instant Whatsapp/Email Delivery

Blazingprojects App

Related Research

Petroleum engineerin. 3 min read

A unified Framework for Multiscale Pore-Scale-to-Field Reservoir Forecasting...

This research develops a unified framework that links pore-scale processes to field-scale reservoir performance, enabling more accurate forecasts of oil and gas...

BP
Blazingprojects
Read more →
International relati. 4 min read

A Global Expectation Framework for Strategic Diplomacy under Multipolarity...

This research explores how global leaders and major powers coordinate diplomatic behavior in a world where power is distributed among several influential region...

BP
Blazingprojects
Read more →
Industrial chemistry. 4 min read

A Framework for Circularity-Oriented Catalytic Process Design in Industry...

This research explores how catalytic processes in industry can be redesigned to support circular economy principles, reducing waste, conserving resources, and e...

BP
Blazingprojects
Read more →
Human resource manag. 2 min read

A Dynamic Resilience-Based Framework for HR Transformation and Outcomes...

This research explores how organizations can make HR practices more resilient and dynamic in the face of rapid changes such as technology disruption, demographi...

BP
Blazingprojects
Read more →
Home and rural econo. 3 min read

A Farm-Province Adaptive Resilience Framework for Rural Households...

This research investigates how rural households connected to both farming and provincial markets build resilience to shocks and stresses. It addresses the gap b...

BP
Blazingprojects
Read more →
Geo-science. 2 min read

A Framework for Integrating Isotopic Signatures in Sedimentary Basin Thermochronolog...

This research explores how isotopic signatures can be integrated into thermochronology studies of sedimentary basins to better understand their thermal historie...

BP
Blazingprojects
Read more →
French. 3 min read

Cadre théorique pour l’évaluation éthique des IA en entreprise ...

This research explores how to build and apply a theoretical framework for evaluating the ethics of artificial intelligence (AI) used in business settings. It as...

BP
Blazingprojects
Read more →
Environmental scienc. 3 min read

A Resilience-Framing Framework for Urban Water–Energy–Waste Nexus Governance...

The research topic explores how cities can manage the interconnected systems of water, energy, and waste more effectively by using a resilience-framing framewor...

BP
Blazingprojects
Read more →
Environmental manage. 4 min read

A Resilience-Framing Framework for Urban Environmental Management Systems...

This research explores a resilience-framing framework for urban environmental management systems, focusing on how cities plan for, respond to, and learn from en...

BP
Blazingprojects
Read more →
WhatsApp Click here to chat with us