Environmental factors influencing construction time and cost overruns on high-rise project in nigeria

 

Table Of Contents


Thesis Abstract

Environmental factors play a crucial role in the successful completion of construction projects, especially high-rise projects in Nigeria. This research aims to investigate the impact of environmental factors on construction time and cost overruns on high-rise projects in Nigeria. The study will focus on identifying the key environmental factors that contribute to delays and cost overruns in high-rise construction projects in Nigeria. The research will employ a mixed-methods approach, combining quantitative analysis of project data with qualitative interviews and surveys of project stakeholders. Data will be collected from ongoing and completed high-rise projects in Nigeria, with a specific emphasis on projects that have experienced significant time and cost overruns. The study will consider a range of environmental factors, including weather conditions, soil quality, access to resources, and regulatory constraints. By analyzing the relationship between these factors and project performance indicators such as construction duration and budget deviations, the research aims to provide insights into the specific environmental factors that have the most significant impact on construction time and cost overruns. Through in-depth interviews with project managers, contractors, and other stakeholders, the research will also explore the perceptions and experiences of construction professionals regarding the influence of environmental factors on project delays and cost overruns. By incorporating the perspectives of these stakeholders, the study will provide a comprehensive understanding of the complex interactions between environmental factors and project outcomes. The findings of this research will have practical implications for the management of high-rise construction projects in Nigeria. By identifying the environmental factors that most significantly impact project performance, construction professionals can develop strategies to mitigate the effects of these factors and reduce the likelihood of delays and cost overruns. Additionally, the research will contribute to the existing body of knowledge on construction project management in Nigeria, providing valuable insights for future research and practice in the field. Overall, this research aims to enhance our understanding of the environmental factors influencing construction time and cost overruns on high-rise projects in Nigeria and to provide actionable recommendations for improving project outcomes in this context.

Thesis Overview

<p> </p><p><strong>Introduction</strong></p><p>Construction time: The Nigerian construction industry contributes less to the country’s economy than do manufacturing or other service industries. Of®cially, construction accounted for only 5.5% of the annual gross domestic product (GDP) in 1993 (Langdon, 1994). However, the growth of the Indonesian construction industry has greatly in¯ uenced the country’s economic development. As de®ned in developed countries (Hillebrandt, 1985), con- struction is considered unique in that it can stimulate the growth of other industrial sectors. Hence to consider growth of the construction industry in terms of its contribution to GDP in isolation is somewhat misleading: that is, to do so understates the crucial role played by construction. Therefore, improving construction ef®- ciency by means of cost-effectiveness and timeliness would certainly contribute to cost savings for the country as a whole. Effort directed to cost and time- effectiveness were associated with managing time and cost, which in this study was approached via investigating time and cost overruns of high-rise construction in Nigeria.</p><p>Like developing countries, such as Nigeria (Okpala and Aniekwu, 1988; Elinwa and Buba, 1993;<br>Mans®eld et al., 1994), Saudi Arabia (Assaf et al., 1995) and Malaysia (Yong, 1988), Indonesia suffers from construction time and cost overruns. The intentions<br>of this paper therefore are:</p><p>1. to identify variables in¯ uencing construction time and cost overruns;<br>2. to group these variables into factors;<br>3. to analyse the relationship of these factors and thereby enhance understanding of construction delays and cost overruns. Although the research concentrates on Nigeria, the ®ndings should be relevant to all developing countries, as they face similar problems in terms of time and cost overruns on construction and infrastructural development projects (Morris and Hough, 1987). Construction Management and Economics (1997) 15, 83±94 Factors in¯ uencing construction time and cost overruns on high-rise projects in Nigeria</p><p><strong>Causes of time and cost overruns</strong></p><p>According to Antill and Wood head (1989), time over runs<br>(delays) can be divided into three categories:<br>1. those over which neither party to the contract has any control;<br>2. those over which the construction owner (or his/her representative) has control;<br>3. those over which the contractor (or any subcontractor) has control.<br>It is generally recognized that delays of type 1 are part of the contractor’s normal and legitimate monetary<br>risk, and hence should give neither party grounds for monetary recompense, but that the contract com- pletion date should be extended in order to protect contractors from liquidated damages claims for late &nbsp;completion. Alternatively, in the extreme a contract may be repudiated due to `frustration’. It is also recog- nized that for delays of type 2 the contractor should receive fair and reasonable recompense (cost and time), whereas for type 3 delays the contractor must bear full responsibility.</p><p>&nbsp;</p> <br><p></p>

Blazingprojects Mobile App

📚 Over 50,000 Research Thesis
📱 100% Offline: No internet needed
📝 Over 98 Departments
🔍 Thesis-to-Journal Publication
🎓 Undergraduate/Postgraduate Thesis
📥 Instant Whatsapp/Email Delivery

Blazingprojects App

Related Research

Petroleum engineerin. 3 min read

A unified Framework for Multiscale Pore-Scale-to-Field Reservoir Forecasting...

This research develops a unified framework that links pore-scale processes to field-scale reservoir performance, enabling more accurate forecasts of oil and gas...

BP
Blazingprojects
Read more →
International relati. 2 min read

A Global Expectation Framework for Strategic Diplomacy under Multipolarity...

This research explores how global leaders and major powers coordinate diplomatic behavior in a world where power is distributed among several influential region...

BP
Blazingprojects
Read more →
Industrial chemistry. 3 min read

A Framework for Circularity-Oriented Catalytic Process Design in Industry...

This research explores how catalytic processes in industry can be redesigned to support circular economy principles, reducing waste, conserving resources, and e...

BP
Blazingprojects
Read more →
Human resource manag. 3 min read

A Dynamic Resilience-Based Framework for HR Transformation and Outcomes...

This research explores how organizations can make HR practices more resilient and dynamic in the face of rapid changes such as technology disruption, demographi...

BP
Blazingprojects
Read more →
Home and rural econo. 4 min read

A Farm-Province Adaptive Resilience Framework for Rural Households...

This research investigates how rural households connected to both farming and provincial markets build resilience to shocks and stresses. It addresses the gap b...

BP
Blazingprojects
Read more →
Geo-science. 4 min read

A Framework for Integrating Isotopic Signatures in Sedimentary Basin Thermochronolog...

This research explores how isotopic signatures can be integrated into thermochronology studies of sedimentary basins to better understand their thermal historie...

BP
Blazingprojects
Read more →
French. 2 min read

Cadre théorique pour l’évaluation éthique des IA en entreprise ...

This research explores how to build and apply a theoretical framework for evaluating the ethics of artificial intelligence (AI) used in business settings. It as...

BP
Blazingprojects
Read more →
Environmental scienc. 3 min read

A Resilience-Framing Framework for Urban Water–Energy–Waste Nexus Governance...

The research topic explores how cities can manage the interconnected systems of water, energy, and waste more effectively by using a resilience-framing framewor...

BP
Blazingprojects
Read more →
Environmental manage. 3 min read

A Resilience-Framing Framework for Urban Environmental Management Systems...

This research explores a resilience-framing framework for urban environmental management systems, focusing on how cities plan for, respond to, and learn from en...

BP
Blazingprojects
Read more →
WhatsApp Click here to chat with us