- Title page
Certification- – – – – – – – – i
Dedication– – – – – – – – – ii
Acknowledgement- – – – – – – – iii
Abstract – – – – – – – iv
Table of contents- – – – – – – – v
List of figures- – – – – – – – – viii
List of tables- – – – – – – – – ix
Chapter ONE
INTRODUCTION
- 1.1Background of the project- – – – – – 1
- 1.2Statement of problems – – – – – – 2
- 1.3Objectives of the project – – – – – 2
- 1.4Justification for the project – – – – – – 3
- 1.5Scope of the project – – – – – – – 3
- 1.6Projects report organization – – – – – – 3CHAPTER TWO
LITERATURE REVIEW
- 2.1An overview of Nigeria youth service corps – – – 5
- 2.2Operation of the NYSC scheme – – – – – 8
- 2.3Four phase programme of the NYSC – – – – – 9
2.
- 3.1Mobilization – – – – – – – – 9
2.
- 3.2Orientation Programme – – – – – 9
2.
- 3.3Primary Assignment – – – – – – 10
2.
- 3.4Community Development Service- – – – 11
2.
- 3.5Winding programme and Passing out Parade – – 12
- 2.4Orientation Process for Prospective (NYSC) Members- 13
2.
- 4.1Orientation course/Duration – – – – – 13
2.
- 4.2Registration- – – – – – – – 14
2.
- 4.3Meal ticket/feeding – – – – – – – 15
2.
- 4.4Accommodation on camp- – – – – – 15
2.
- 4.5Orientation Broadcasting service (OBS) – – – 15
2.
- 4.6Platoon and platoon activities- – – – – 16
2.
- 4.7Kit Items/ Mode of Dressing- – – – – – 17
2.
- 4.8Discipline- – – – – – – – – 17
- 2.4.9Security – – – – – – – – – 18
- 2.5ID Cards- – – – – – – – – 18
2.
- 5.1Medical care – – – – – – – – 18
2.
- 5.2Camp market- – – – – – – – 19
2.
- 5.3Socials- – – – – – – – – 19
2.
- 5.4Posting- – – – – – – – – 19
2.
- 5.5Relocation– – – – – – – – 20
2.
- 5.6Exeat- – – – – – – – – 20
2.5.7Religious Activities at Orientation Camp – – – 20
2.
- 5.8Corps Allowance – – – – – – – 20
- 2.5.9Prominent Activities on Camp – – – – 21
Chapter THREE
SYSTEM DESIGN AND IMPLEMENTATION
- SYSTEM ANALYSIS AND DESIGN
- 3.1Methodology – – – – – – – – 22
3.
- 1.1Methods of data collection – – – – – 22
- 3.2Data Analysis – – – – – – – 22
- 3.3Analysis of the existing system – – – – – 23
- 3.4Limitations of the existing system – – – – 24
- 3.5system design – – – – – – – – 24
Chapter FOUR
SYSTEM TESTING AND EVALUATION
- IMPLEMENTATION, TESTING AND INTEGRATION
- 4.1Choice of programming language – – – – – 31
- 4.2System requirement – – – – – – – 31
4.
- 2.1Software requirements – – – – – – 31
4.
- 2.2Hardware requirements – – – – – – 31
- 4.3Implementation – – – – – – – – 32
4.
- 4.1Unit testing – – – – – – – – 35
4.
- 4.2System testing – – – – – – – 38
Chapter FIVE
SUMMARY, CONCLUSION AND RECOMMENDATIONS
- LIMITATIONS AND CONCLUSION
- 5.1Summary – – – – – – – – 39
- 5.2Limitations of the project – – – – – – 39
- 5.3Bill of engineering measurement and evaluation – – 40
- 5.4Conclusion – – – – – – – – – 40
BIBILIOGRAPHY
APPENDIX A
PROGRAM SOURCE CODE
APPENDIX B
SAMPLE OUTPUT
APPENDIX C
USER GUIDE
LIST OF FIGURES
- 3.1The NYSC Registration Form – – – – – 27
- 3.2The Posting Form – – – – – – – 28
- 3.3The System Flowchart – – – – – – 29
- 3.4The Top Down Design – – – – – – 30
4.
- 3.1The NYSC Login Window – – – – – 33
4.3.
- 2.Admin Form Window – – – – – – 34 LIST OF TABLES
Table 1 Unit Testing
–
–
–
–
–
–
– 35
Table 2 project costing
–
–
–
–
–
–
– 40
Thesis Abstract
This Project Design and Implementation of Orientation Camp Information
System (A Case Study of NYSC Orientation Camp Awgu ) was designed to
eliminate the problems associated with manual handling of information at
the Orientation Camp such as data redundancy, time wastage etc. The
Design and Implementation was carried out using the top down software
development approach. The tools used to implement this project are
VB.Net and SQL Server.