INTRODUCTION
LITERATURE REVIEW
RESEARCH METHODOLOGY
DATA PRESENTATION AND ANALYSIS
SUMMARY, CONCLUSION AND RECOMMENDATIONS
This study focuses on effect of earned value management (EVM) and critical chain (CC) on successful project implementation in construction companies in South Eastern Nigeria. Here 7 objectives was explored to undertake this study and the hypotheses structured in line with these 7 objectives. A sample size of 759 was determined from the population of 14868 drawn from the employees of 12 selected construction companies in South East Nigeria using a combination of the Godden (2004) sample formula, and the sample estimation technique of Unyimadu (2005), Nwanna (1922) and Israel (1922). The major instruments used for primary data collection was the questionnaire and oral interview. The questionnaire was structured using 5-point Likert scale in line with the 7 objectives of the study. Cronbach Alpha was objectively used in testing the validity and the reliability of the research instrument. The result was above 0.70 in all, indicating a high degree of relationship. The tests of hypotheses 2 and 3 were carried out using the multiple regression analysis and hypotheses1, 4, 5, 6 and 7were tested with t-test. The findings showed that there is significant perception of EVM and CC on successful project implementation in construction companies in South Eastern, Nigeria. The study disclosed that the issues relating to these techniques for project performance measurement are significant on successful project roimplementation in construction companies in South Eastern, Nigeria. It was also revealed from the study that CC factor in implement EVM process and CC as a performance indicator for effective measurement significantly ensures successful project implementation in construction companies in South Eastern Nigeria. The study identified inadequate budgeting and schedule/ work-breakdown structure (WBS) integration as the key challenges of EVM and CC on successful project implementation in construction companies in South Eastern, Nigeria. Furthermore, the study discovered that EVM and CC make significant and positive contribution to improved project management practice on construction companies in South Eastern Nigeria. The study also revealed that there are positive implications of EVM and CC in management control, cost performance index on success of project execution. Finally, that there are significant correlation between the use of EVM and CC with each phase of the project life cycle and success in construction companies in South Eastern, Nigeria. The study concludes that the effective practice of EVM and CC shall lead to a number of benefits to the organization as in maximizing performance, enabling time and cost management and synergistically driving project performance measurement strategies to a fruitful end. The study recommended that, the construction companies should adopt the use of EVM and CC thereby focusing on the key criteria of well defined project spectrum, goals, parameter, and project control mechanism in order to enhance successful project implementation, also that the construction companies should embrace well formulated procedures for performing work, integrate planning and teamwork in order to monitor and control their daily task to attain successful end.
This Research Project Material is posted with good intentions. if you own it, and believe that your right is infringed or violated, Please send us a mail – admin@freeresearchproject.com.ng and actions will be taken immediately. Thank you.
Download Complete Project Material
Talk to us
Please call 08111770269 or +2348059541956 to place an order or use the whatsapp button below to chat us up.
The complete project material to this project topic costs N5000 ($15) and contains abstract, table of contents, Chapters 1 – 5, references and appendices (questionaire, images, etc). Please pay to
Bank UBA
Account No 1021412898
Account Name Starnet Innovations Limited
📚 Over 50,000 Research Thesis
📱 100% Offline: No internet needed
📝 Over 98 Departments
🔍 Thesis-to-Journal Publication
🎓 Undergraduate/Postgraduate Thesis
📥 Instant Whatsapp/Email Delivery
This research develops a unified framework that links pore-scale processes to field-scale reservoir performance, enabling more accurate forecasts of oil and gas...
This research explores how global leaders and major powers coordinate diplomatic behavior in a world where power is distributed among several influential region...
This research explores how catalytic processes in industry can be redesigned to support circular economy principles, reducing waste, conserving resources, and e...
This research explores how organizations can make HR practices more resilient and dynamic in the face of rapid changes such as technology disruption, demographi...
This research investigates how rural households connected to both farming and provincial markets build resilience to shocks and stresses. It addresses the gap b...
This research explores how isotopic signatures can be integrated into thermochronology studies of sedimentary basins to better understand their thermal historie...
This research explores how to build and apply a theoretical framework for evaluating the ethics of artificial intelligence (AI) used in business settings. It as...
The research topic explores how cities can manage the interconnected systems of water, energy, and waste more effectively by using a resilience-framing framewor...
This research explores a resilience-framing framework for urban environmental management systems, focusing on how cities plan for, respond to, and learn from en...