Home / Building / ANALYTICAL AND APPROXIMATE VARIANCE OF PUBLIC BUILDING TOTAL PROJECT COST, ESTIMATION BY MEAN COMPONENT COSTS METHOD

ANALYTICAL AND APPROXIMATE VARIANCE OF PUBLIC BUILDING TOTAL PROJECT COST, ESTIMATION BY MEAN COMPONENT COSTS METHOD

 

Table Of Contents


Chapter ONE

INTRODUCTION

  • 1.1Introduction
  • 1.2Background of Study
  • 1.3Problem Statement
  • 1.4Objective of Study
  • 1.5Limitation of Study
  • 1.6Scope of Study
  • 1.7Significance of Study
  • 1.8Structure of the Research
  • 1.9Definition of Terms

Chapter TWO

LITERATURE REVIEW

  • 2.1Overview of Public Building Total Project Cost Estimation
  • 2.2Mean Component Costs Method in Project Cost Estimation
  • 2.3Historical Perspectives on Project Cost Estimation
  • 2.4Factors Affecting Public Building Project Cost Estimation
  • 2.5Best Practices in Project Cost Estimation
  • 2.6Comparative Analysis of Project Cost Estimation Methods
  • 2.7Case Studies on Public Building Project Cost Estimation
  • 2.8Technology and Innovation in Project Cost Estimation
  • 2.9Challenges in Public Building Project Cost Estimation
  • 2.10Future Trends in Project Cost Estimation

Chapter THREE

RESEARCH METHODOLOGY

  • 3.1Research Methodology Overview
  • 3.2Research Design and Approach
  • 3.3Data Collection Methods
  • 3.4Sampling Techniques
  • 3.5Data Analysis Procedures
  • 3.6Validity and Reliability of Data
  • 3.7Ethical Considerations
  • 3.8Limitations of Research Methodology

Chapter FOUR

DATA PRESENTATION AND ANALYSIS

  • 4.1Analysis of Public Building Total Project Cost Estimation
  • 4.2Variance in Mean Component Costs Method
  • 4.3Factors Influencing Variance in Project Cost Estimation
  • 4.4Comparative Analysis of Estimated vs. Actual Costs
  • 4.5Case Studies on Variance in Project Cost Estimation
  • 4.6Recommendations for Improving Cost Estimation Accuracy
  • 4.7Implications of Variance in Project Cost Estimation
  • 4.8Future Research Directions

Chapter FIVE

SUMMARY, CONCLUSION AND RECOMMENDATIONS

  • 5.1Conclusion and Summary of Findings
  • 5.2Recap of Research Objectives
  • 5.3Contributions to Knowledge
  • 5.4Practical Implications
  • 5.5Recommendations for Practice
  • 5.6Areas for Future Research
  • 5.7Concluding Remarks

Thesis Abstract

Building construction project has become an everyday issue, and this involves the spending of hard earned money by the project owner called the client. The expectation of the owner of any building project is justification of good project delivery.Analytical and approximate variance of public building total project cost, estimation by mean component costs method.This is enabled by the objectives of the project which definitely includes project cost that envelopes the cost and quality of delivery at the expected time. The major issue, is the project cost which dictates its success. Project cost variance has been affecting the speedy and successful delivery of building construction projects. The key fact in this study method was to collect and analyse public building project cost estimates containing building components, which includes preliminaries, substructure, superstructure, mechanical/electrical, external works and contingency in the bill of quantity (BOQ) from projects handled by Education Trust Fund(ETF) in the tertiary institutions located in Kaduna, Kwara, Kogi and Abuja from 2009 to 2010. The study adopted mean component cost method modeled by Skitmore and Ng (2002) to determine the projected cost variance of the Lecture Theatres and Lecture Rooms handled by the organization in various tertiary institutions in Nigeria. The analysis of the data collected was made by using standard method of analysis which employs SPSS for the project costs.Skitmore and Ng (2002) model was employed to test the variability of the project cost data. The result shows that; the building component cost data 4782.50 had closer link to the mean 4773.92(mean) for preliminaries component column in project ID 4 of Lecture Theatreandanother component data 2797.62 is also close to 2312.91(mean) for Ext.Wkscolumn in project ID 7 for the Lecture Theatre building projects butfor the Lecture Classrooms building the preliminaries column had 1531.41 and 1416.33(mean) in project ID 2 and 1611.22 and 1673..58(mean) for M/E column for project ID 5. This project therefore concludes in addition to the results of the cost variances, that the lecture theatre and classrooms projects are underestimated.Interview was also conducted on the professional estimators in building industry. Moreover significant differences exist among the components in those public buildings.The analytical calculation shows that the correct variance for an average lecture theatre project from this research was found to be 34.73%. The sample analyzed had shown that the correct variance of the class room was found to be 38. 50%. Therefore lecture theatre is observed to be a better building project than the class room building. The study recommends the need to minimize the occurrence of the overrun by thoroughly crosschecking the initial estimate and addressing other technical issues before the contract is awarded. It also recommends the employment of the mean component cost method of analysis and setting of a committee to properly scrutinize the estimate.


Thesis Overview

<p> </p><div>In the building construction industry, it is a formal procedure to determine the initial cost of a building project before awarding the contract. This is in order to ascertain the financial level of the client whether the project is worth undertaking. The underlyingfact is because of the instability of the market prices of material, labour and equipment which are the major tools involved in the construction.</div><div>The wave of project production cost variability in the recent time calls for a concern in the building industry. If a building project cost estimate is presented for tender and the contractor gives his quotations, with all necessary adjustment made and contract is awarded, it is not likely that the agreed contract price will still be the final project cost at completion. The final project cost is often found to be higher at completion.</div><div>There are many factors leading to the changes in the final cost. Giwa (1998) had stated that the effect of change between the initial and the final cost incurred constitute a major problem in the building industry, especially between the client and estimator. This cost differential is called cost variance in the building construction industry. Cost variance is significant for general cost planning, and can be a big problem to solve by the managers in the building industry.</div> <br><p></p>

Blazingprojects Mobile App

📚 Over 50,000 Research Thesis
📱 100% Offline: No internet needed
📝 Over 98 Departments
🔍 Thesis-to-Journal Publication
🎓 Undergraduate/Postgraduate Thesis
📥 Instant Whatsapp/Email Delivery

Blazingprojects App

Related Research

Physiotherapy. 4 min read

Developing a Holistic Model for Chronic Low Back Pain Management in Physiotherapy...

This research aims to create a comprehensive and practical model to help physiotherapists better manage patients with chronic low back pain. Chronic low back pa...

BP
Blazingprojects
Read more →
Physiology. 2 min read

A Framework for Integrating Autonomic Nervous System Responses in Cardiovascular Reg...

This research aims to develop a comprehensive framework that explains how the autonomic nervous system (ANS) controls and coordinates cardiovascular functions. ...

BP
Blazingprojects
Read more →
Philosophy. 4 min read

A Model for Ethical Decision-Making in Autonomous Artificial Agents...

This research explores how to help autonomous artificial agents, like robots or self-driving cars, make ethical decisions when facing dilemmas. As these machine...

BP
Blazingprojects
Read more →
Pharmacy. 4 min read

A Conceptual Framework for Enhancing Medication Adherence Through Pharmacist-Patient...

This research focuses on understanding how better communication between pharmacists and patients can improve medication adherence, which is when patients follow...

BP
Blazingprojects
Read more →
Paediatrics. 3 min read

A Framework for Holistic Pediatric Growth and Development Assessment...

This research focuses on creating a comprehensive framework that can be used to assess how children grow and develop in all areas—physical, cognitive, emotion...

BP
Blazingprojects
Read more →
Office technology. 4 min read

A Framework for Integrating Artificial Intelligence into Office Technology Practices...

This research aims to develop a practical framework to effectively integrate artificial intelligence (AI) into office technology practices. In modern workplaces...

BP
Blazingprojects
Read more →
Nursing. 2 min read

Developing a Holistic Framework for Nurse-Patient Relationship Enhancement in Chroni...

This research focuses on creating a comprehensive and practical framework to improve the relationship between nurses and patients who are managing long-term, ch...

BP
Blazingprojects
Read more →
Music. 4 min read

A Framework for Analyzing Emotional Expression in Cross-Cultural Music Performance...

This research explores how emotions are expressed and perceived in music performances that come from different cultural backgrounds. Music is a universal langua...

BP
Blazingprojects
Read more →
Microbiology. 3 min read

A Framework for Predicting Antibiotic Resistance Development in Clinical Bacteria...

This research aims to develop a helpful framework that can predict how bacteria that cause infections in hospitals and clinics become resistant to antibiotics. ...

BP
Blazingprojects
Read more →
WhatsApp Click here to chat with us