AN ASSESSMENT OF CONTRACTOR’S RISKS EXPOSURE WITHIN SOME STANDARD FORMS OF BUILDING CONTRACT IN NIGERIA

 

Table Of Contents


Chapter ONE

INTRODUCTION

  • 1.1Introduction
  • 1.2Background of Study
  • 1.3Problem Statement
  • 1.4Objective of Study
  • 1.5Limitation of Study
  • 1.6Scope of Study
  • 1.7Significance of Study
  • 1.8Structure of the Research
  • 1.9Definition of Terms

Chapter TWO

LITERATURE REVIEW

  • 2.1Overview of Contractor's Risks Exposure
  • 2.2Standard Forms of Building Contracts
  • 2.3Risk Management in Construction Industry
  • 2.4Types of Risks Faced by Contractors
  • 2.5Mitigation Strategies for Contractor's Risks
  • 2.6Comparative Analysis of Different Contract Forms
  • 2.7Case Studies on Contractor's Risks Exposure
  • 2.8Legal Framework for Contractor's Risks in Nigeria
  • 2.9Global Best Practices in Managing Contractor's Risks
  • 2.10Emerging Trends in Contractor's Risks Management

Chapter THREE

RESEARCH METHODOLOGY

  • 3.1Research Methodology Overview
  • 3.2Research Design and Approach
  • 3.3Data Collection Methods
  • 3.4Sampling Techniques
  • 3.5Data Analysis Procedures
  • 3.6Ethical Considerations
  • 3.7Validity and Reliability of Data
  • 3.8Limitations of the Research Methodology

Chapter FOUR

DATA PRESENTATION AND ANALYSIS

  • 4.1Data Analysis and Interpretation
  • 4.2Contractor's Risks Exposure Patterns
  • 4.3Factors Influencing Contractor's Risks
  • 4.4Comparison of Risks Across Contract Forms
  • 4.5Implications of Risks on Project Performance
  • 4.6Recommendations for Risk Mitigation
  • 4.7Case Studies Analysis
  • 4.8Discussion on Findings

Chapter FIVE

SUMMARY, CONCLUSION AND RECOMMENDATIONS

  • 5.1Summary of Findings
  • 5.2Conclusions Drawn from the Study
  • 5.3Contributions to Knowledge
  • 5.4Implications for Practice
  • 5.5Recommendations for Future Research

Thesis Abstract

Construction projects are subjected to several risks due to different activities involved. The activities are performed by several parties.An assessment of contractor’s risks exposure within some standard forms of building contract in nigeria .under different circumstances. Among the various stakeholders the Contractor has been identified to be the party that carries the highest number of risks. They are mostly exposed to contractual risks which occur as a function of contract provisions and clauses. This research work identified and assessed the risks which Contractors are exposed to within some Standard Forms of Contract in Nigeria. It further determined the likelihood of occurrence of the identified risks, impact on the risks on Contractors and the level of risks. Data were collected through questionnaires distributed to some Contractors around Abuja and analysed using qualitative risk analysis technique. The research identified 35 potential risk factors with 54% of the risks emanating from the Clients, 31% from the Architect, 6% from the Quantity Surveyor, 6% from the Project Managers and 3% from the government agents. It also found out that failures to write instructions regarding variations and documents which are not issued on time are the major potential risk factors with high likelihood of occurrence while the other risk factors have moderate likelihood of occurrence. Thirteen (13) potential risk factors were found to have high impact on Contractors and fifteen (15) are high degree of risk. It concluded that Contractors must understand the nature of risks, their source and the extent of exposure so as to pay attention to dealing with such risks in present and future projects. The study therefore recommended that Contractor should pay attention to risks with high likelihood of occurrence so as to reduce their impact, should protect themselves against risks by contingency, warn parties of potential delays and its implications, negotiate construction schedule with client and allow for buffer time, the contractor should ensure working with carefully prepared and coordinated drawings, establish clear line of communications for receiving and responding to instructions and collaborative effort from all the participants of the project.



Thesis Overview

<p> The construction industry is a unique and dynamic industry of the economy; in Nigeria it accounts for over 1.4% of its Gross Domestic Product and also it is a large employer of labour (Oluwakiyesi, 2011). But over the years it has been criticized for its expensive and wasteful nature, low productivity, quality problem and project delay. The reasons for all these being are as varied, diverse and complex as the products of this industry itself. The process of developing a project from initial investment appraisal to completion and into use is complex (Flanagan and Norman, 2003). It is a generally recognized fact that those within the construction industry are continually faced with a variety of situations involving many unknown, unexpected, frequently undesirable and often unpredictable factors. These uncertain situations according to Turner (1990) have made many projects to fall short of the desired objectives of cost, time, quality and satisfaction. Project Management Institute (2000) defines risk as uncertain event or condition that if it occurs has a positive or negative effect on the project objective. Bufaied (1987) also describes risk in relation to construction as a variance in the process of a construction project whose variation results in uncertainty as to the final cost, duration and quality of the project. There are many risks involved in construction projects, which could be attributed to a number of reasons; amongst them are the nature of the construction process, the complexity and time-consuming design and construction activities, the involvement of a multitude of people, from different organizations, with different skills and interests, all resulting in accumulative associated risks for the project. Hence, a great deal of effort is required to co-ordinate the wide range of activities that are undertaken (Chapman and Ward, 1997; Shen, 1999). As the size and complexity of the projects have increased, the ability to manage risks throughout the construction processes has become a central concern in the attempt to prevent unwanted consequences (Maytoren et al., 2007). <br></p>

Blazingprojects Mobile App

📚 Over 50,000 Research Thesis
📱 100% Offline: No internet needed
📝 Over 98 Departments
🔍 Thesis-to-Journal Publication
🎓 Undergraduate/Postgraduate Thesis
📥 Instant Whatsapp/Email Delivery

Blazingprojects App

Related Research

Mechanical engineeri. 4 min read

A Framework for Parametric Modeling of Additive Manufacturing Mechanical Properties...

This research focuses on developing a systematic framework to model the mechanical properties of materials produced through additive manufacturing (AM), also kn...

BP
Blazingprojects
Read more →
Mathematics. 2 min read

A Framework for Modeling Nonlinear Dynamics in Chaotic Systems...

This research aims to develop a comprehensive framework for understanding and modeling nonlinear dynamics in chaotic systems. Chaotic systems are complex system...

BP
Blazingprojects
Read more →
Materials and Metall. 4 min read

A Framework for Predicting Corrosion Resistance in Aluminum Alloy Composites...

This research focuses on developing a structured way to predict how well aluminum alloy composites resist corrosion, which is a common challenge in many industr...

BP
Blazingprojects
Read more →
Mass communication. 3 min read

A Framework for Analyzing the Impact of Social Media Influencers on Youth Political ...

This research examines how social media influencers affect the way young people engage with politics. In recent years, social media influencers—individuals wi...

BP
Blazingprojects
Read more →
Marketing. 2 min read

A Framework for Integrating Social Media Engagement into Customer Loyalty Models...

This research explores how social media engagement influences customer loyalty, aiming to create a new framework that combines these two areas. Customer loyalty...

BP
Blazingprojects
Read more →
Linguistics. 2 min read

A Framework for Analyzing Code-Switching as a Pragmatic Competence...

This research is focused on understanding how people switch between languages or dialects in everyday conversation, a phenomenon known as code-switching. Specif...

BP
Blazingprojects
Read more →
Library Science Educ. 4 min read

A Framework for Enhancing Critical Teaching Skills in Library Science Education...

This research focuses on developing a clear and practical framework that can help improve the way library science educators teach critical thinking skills. Crit...

BP
Blazingprojects
Read more →
Library and informat. 3 min read

A Framework for Assessing Information Literacy Development in Academic Libraries...

This research is about creating a clear and practical framework that can be used to assess how well students in universities develop their information literacy ...

BP
Blazingprojects
Read more →
Law. 2 min read

A Framework for Incorporating Digital Evidence into Judicial Decision-Making...

This research focuses on developing a clear and practical framework for how courts and judges can better include digital evidence when making legal decisions. D...

BP
Blazingprojects
Read more →
WhatsApp Click here to chat with us