Material utilization system in manufacturing enterprise.a case study of asaba textile mill limited asaba)
Table Of Contents
- Title PageApproval PageDedicationAcknowledgementAbstractContentsCHAPTER ONE1.0 Introduction1.1 Statement of Problem1.2 Purpose of Study1.3 Hypothesis1.4 Significance of study1.5 Limitation1.6 Delimitation1.7 Definition of termsCHAPTER TWO2.0 Review of Related Literature2.1 Source and Nature of Raw Material2.2 Planning material requirement2.3 Material utilization2.4 Need for material utilization2.5 Organizational responsibility for material utilization2.6 The purchasing policy of the mill2.7 Receiving and storage2.8 Stock taking method2.9 Stock level.2.
- 9.1Ordering cost2.
- 9.2The Economic Order Quantity (EOQ)2.
- 9.3The lead time2.
- 9.4Re- Order level (ROL)2.
- 9.5Minimum stock level2.
- 9.6The Re-order Quantity2.
- 9.7The Re-order Quantity2.
- 9.8The inventory quantity2.
- 9.9Valuation of inventoryCHAPTE THRE3.0 Research methodology3.1 Source of data3.
- 1.1Primary data3.
- 1.2Secondary data3.
- 1.3Population and sample size3.
- 1.4Methodology usedCHAPTER FOUR4.0 The analysis of data and discussion4.1 Empirical Research into the manufacturing enterprise4.2 DiscussionCHAPTER FIVE5.1 Summary of results5.2 Summary of findings5.3 Conclusion5.4 Recommendation5.5 Appendix A: Organization chart of Asaba.Textile mill LtdAppendix B: Percentage waste computation of material input in the processing/finishing departmentAppendix C: Specimen of questionnaire used
Thesis Abstract
Abstract
Material utilization is a critical aspect of manufacturing enterprises as it directly impacts production costs and overall efficiency. This research project focuses on investigating the material utilization system at Asaba Textile Mill Limited in Asaba, Nigeria. The study aims to analyze the current material utilization practices in the company and identify areas for improvement to enhance efficiency and reduce waste. A case study approach is employed to gather data through interviews, observations, and document analysis. The research findings reveal that Asaba Textile Mill Limited faces challenges in material utilization, including overstocking, underutilization of materials, and inefficiencies in inventory management. These issues contribute to increased production costs and reduced profitability for the company. The study identifies several factors influencing material utilization at the textile mill, such as inadequate inventory control systems, lack of accurate demand forecasting, and limited employee training on material handling practices. Recommendations are proposed to address these challenges, including the implementation of a just-in-time inventory system, investment in employee training programs, and the adoption of advanced inventory management software. By improving material utilization practices, Asaba Textile Mill Limited can reduce waste, optimize inventory levels, and enhance overall operational efficiency. This research contributes to the existing literature on material utilization systems in manufacturing enterprises and provides practical insights for managers and decision-makers in similar industries. Overall, this study highlights the importance of effective material utilization in improving the competitiveness and sustainability of manufacturing enterprises. By implementing the recommended strategies, Asaba Textile Mill Limited can enhance its material utilization system, reduce costs, and improve its overall performance in the market.
Thesis Overview
<p>
</p><p>1.0 INTRODUCTION: A history of Bendel Textile mill Ltd as it was</p><p>called in the then defunct Bendel state but now renamed Asaba Textile mill Ltd immediately after the splitting of the state into Edo and Delta states in 1991, was incorporation in 1965.</p><p>It was located on the eastern side of the town, Asaba, the headquarters of Delta state. It is cited close to the Lagos-Onitsha Express way for easy accessibility. The mill was created to assist in the relief of unemployment and to reduce rural migration of people to urban areas.</p><p>Amongst other objectives of the firm are the manufacturing of textile fabric (100% cotton), modernization and expansion. However, the product line of the company is Africa print with a planned production capacity of 4000 metres per day. Crey cloth which is 10,560, 000 matres per annum taking twenty –two working days in a month. Both the production capacities so far achieved are 30,000 metres per day Grey baft that is 7920,000-metre p.a. The slack in the full capacity achievement is due to insufficient supply of raw material (R/M), high labour cost, high labour turnover mostly in the spinning and weaving departments at the beginning of every year and also the demechanization of machines. The company has to cannibalize to put some machines into operation and a colossal amount is spent on the importation of German expatriates to carry out the job of machine cannibalism.</p><p>Moreso, the mill has staff strength of 840 comprising Administration, factory workers, security unit and labourers. It has a total sale of over eighty million Naira (N80m) p.a.</p><p>The raw materials used by the mill are; cotton hint, chemical and dyestuff. Some are sourced locally while some are imported. Indian expatriates own the mill.</p><p><strong>1.2 STATEMENT OF PROBLEM</strong></p><p>. The mill has chains of problems as regards the utilization of materials. A lot of problems of wastage are being suffered in the mill conspicuous amongst which are:</p><p>i. Drops of cotton on the factory floor in the spinning department. This is of a common sight. As the bales of cotton are being put into the bale opener (machine) and to the scotcher where it forms laps which is taken to the cording machine to form sliver, raw cotton are seen everywhere littering on the floor. The propping cottons should be swept up or hand picked by the workers. Also workers should be provided by the with apron for keeping the dropped picked up good cottons and should be sent back to the scotecher to form a new lap.</p><p>ii. Roving waste: In the speed frame section the shiver is turned in roving. Lots of waste occurs have as a result of machine rejects.</p><p>Solution: The roving waste should be sent back to the roving machine which turns the roving into raw cotton which should then be sent back to the below room for lapping.</p><p>iii. Half Weft: Wefts (wound prins) are normally in full. But in the pirn winding section, it is not uncommon to see half weft, which is automatically a waste, as machine will reject them.</p><p>Solution: To avoid pirn wastage, pirns should not have a double end as this amount to waste. Also the supervisors should constantly monitor the operators and machines should be maintained to avoid mechanical fault.</p><p>iv. Overdrawn Beams: Beams are supposed to be equal. But cases of overdrawn beams are rampant in some unsophisticated textile industries. This often results to waste.</p>