Home / Geophysics / RESERVE ESTIMATE OF IMERI BITUMEN DEPOSIT

RESERVE ESTIMATE OF IMERI BITUMEN DEPOSIT

 

Table Of Contents


Title page   —       –       –       –       –       –       –       –       –       –       – i    

Declaration —       –       –       –       –       –       –       –       –       –       -ii

Approval page —   –       –       –       –       –       –       –       –       –       -iii

Dedication —         –       –       –       –       –       –       –       –       –       -iv

Acknowledgement —       –       –       –       –       –       –       –       –       -v    

Table of content   —         –       –       –       –       –       –       –       –       -vi                 Abstract —   –       –       –       –       –       –       –       –       –       –       -vii


Thesis Abstract

The abstract section of the research content is as follows Abstract
The Imeri bitumen deposit is a key natural resource in the region, with significant potential for economic development and infrastructure improvement. In this study, a comprehensive reserve estimate of the Imeri bitumen deposit was conducted using a combination of geological survey data, well drilling results, and advanced modeling techniques. The estimation process involved analyzing the geological characteristics of the deposit, such as porosity, permeability, and thickness, to determine the total volume of bitumen present. Additionally, the study considered the spatial distribution of the deposit to assess the recoverable reserves and potential extraction methods. The reserve estimate of the Imeri bitumen deposit is crucial for informing local government planning, attracting investment from the private sector, and ensuring sustainable development of the region. The results of the study provide valuable insights into the size and quality of the bitumen deposit, allowing stakeholders to make informed decisions regarding resource management and utilization. Furthermore, the reserve estimate serves as a foundation for future research and exploration activities aimed at expanding the knowledge of the deposit and optimizing extraction techniques. The methodology employed in this study included a combination of field surveys, laboratory analysis, and computer modeling to accurately assess the reserve potential of the Imeri bitumen deposit. By integrating data from multiple sources and utilizing advanced technology, the study was able to generate a reliable estimate of the total reserves available for extraction. The findings highlight the significance of the Imeri bitumen deposit as a strategic resource with the capacity to drive economic growth and industrial development in the region. Overall, the reserve estimate of the Imeri bitumen deposit presented in this study provides a solid foundation for future resource management and development initiatives. The results offer valuable information for policymakers, investors, and stakeholders interested in leveraging the potential of the deposit for sustainable growth and prosperity. Additionally, the study underscores the importance of ongoing research and monitoring efforts to ensure the responsible utilization of the bitumen deposit and the preservation of the surrounding environment.

Thesis Overview

  INTRODUCTION

The Petroleum industry has become the mainstay of the overall economy of Nigeria, accounting for about 90 per cent of the country’s foreign exchange earrings, about 20 per cent of the Gross Domestic Product, and about 85 per cent of the Federal Government collectable revenue. The demand for this back gold is fast increasing worldwide. Figure 1.1, from Purvin & Gertz' most recent Global Petroleum Market Outlook study, shows how petroleum product demand has grown since 1995 and how it is expected to continue to grow through 2015. The study shows a 1.7 % per annum growth in worldwide demand and that this growth rate will continue over the next 15 years. The Purvin & Gertz study also states that the growth in crude supplies from 60 million barrels per day in 1990 to 75 million barrels in 2005 will continue up to 95 million barrels per day in 2020. The current growth in transportation fuel demand is outpacing the supply of traditional crude oil sources.

This gap can be filled through increased production of non-traditional hydrocarbon deposits, such as Canadian oil sands, Venezuelan heavy oils. It is apparent that increasing amounts of petroleum will come from nonconventional sources. Hence the need for the development of our heavy crude deposits. Therefore, in order to ensure continuity and orderly development of the industry, the Federal Government put in place a Petroleum Policy. Prominent among the objectives of the Policy is the development of the large deposit of tar sands in the country.

The extensive geological studies carried out largely by the staff of the University of Ife (now Obafemi Awolowo University) IIe Ife, confirmed the existence of the natural bitumen in Western Nigeria in commercial quantities. Similarly, the limited engineering studies of the naturally occurring bitumen in the Okitipupa area of Ondo State. Also, reference to various reports, newspaper publications and other information media in Nigeria within the last two decades is a pointer to the fact that petroleum crude, generally a major source of bitumen, has been aptly described as Nigeria's "black gold". But can this "black gold" concept of petroleum crude oil be extended to bitumen? Perhaps the second phase of Nigeria's economic breakthrough is round the corner!

It is in the light of the foregoing that the title of this research work has been chosen to read: "the reserve estimate of Bitumen deposit in Imeri, Southwestern Nigeria?" to find out if the natural bitumen can be mined in commercial quantity as a nonconventional petroleum to support Nigeria' s economic sector .

At the end of this project, we hope to be able to find solution to some pertinent questions like:

1)   What is the meaning of bitumen?

2)    What is its reserve estimate of bitumen in the study area?

3)    What is its economic viability?

1.2       AIM AND OBJECTIVE

This project work aimed at determining:

The reserve estimate of bitumen deposit in Imeri, Ogun State, South-western Nigeria.

Its objective is to use this reserve in evaluating its commercial viability.

1.3       SCOPE AND LIMITATION

This project work covers:

  1. The determination of the depth of burial, thickness and aerial extend of deposition of bitumen in the study area.
  2. The estimation of bitumen reserve using the values gotten from above in the study area.

As a result of the short duration coupled with financial constraint this project will be limited to the study area.

1.4       LOCATION AND ACCESIBILITY

The study area lies within latitude 06046´-06049´N and longitudes 003058´-003060´E, on an area extent of approximately eighteen square kilometers (~18sq. km), a sedimentary terrain in the Dahomey Basin of Southwestern, Nigeria. The village has good road network that link it to the express. (Fig. 1.2)

1.5       RELIEF AND DRAINAGE

Imeri is almost a flat plain ground with extremely low relief with elevation between 100ft and 250ft above sea level, the drainage pattern is sub-dendrite-like with an average annual temperature of 310C and mean annual rainfall of 1200mm to 2300mm.

1.6       CLIMATE AND VEGETATION

The climate of Imeri is of moderately high humidity, the vegetation include shrubs, grasses and forest with agriculture being the predominant occupation of the dwellers.

1.7       DURATION

This project work is expected to be done within six (6) months in accordance with the school calendar and should be ready latest September, 2011.

1.8       JUSTIFICATION

This project work when completed will boost the nation’s economy by preserving our conventional oil reserves while attention is focused on bitumen development, if all the recommendations proposed are implemented.


Blazingprojects Mobile App

📚 Over 50,000 Research Thesis
📱 100% Offline: No internet needed
📝 Over 98 Departments
🔍 Thesis-to-Journal Publication
🎓 Undergraduate/Postgraduate Thesis
📥 Instant Whatsapp/Email Delivery

Blazingprojects App

Related Research

Geophysics. 3 min read

Seismic Imaging of Subsurface Structures for Hydrocarbon Exploration using Advanced ...

The project titled "Seismic Imaging of Subsurface Structures for Hydrocarbon Exploration using Advanced Processing Techniques" aims to investigate and...

BP
Blazingprojects
Read more →
Geophysics. 4 min read

Application of Machine Learning Algorithms for Seismic Data Analysis in Geophysics...

The project titled "Application of Machine Learning Algorithms for Seismic Data Analysis in Geophysics" focuses on leveraging advanced machine learnin...

BP
Blazingprojects
Read more →
Geophysics. 2 min read

Application of Machine Learning Algorithms in Seismic Data Analysis for Reservoir Ch...

The project titled "Application of Machine Learning Algorithms in Seismic Data Analysis for Reservoir Characterization" aims to explore the integratio...

BP
Blazingprojects
Read more →
Geophysics. 4 min read

Seismic Imaging and Characterization of Subsurface Fractures in Unconventional Reser...

The research project titled "Seismic Imaging and Characterization of Subsurface Fractures in Unconventional Reservoirs" aims to address the significan...

BP
Blazingprojects
Read more →
Geophysics. 3 min read

Analysis of Ground Penetrating Radar (GPR) data for mapping subsurface features....

The project titled "Analysis of Ground Penetrating Radar (GPR) data for mapping subsurface features" aims to explore the potential of Ground Penetrati...

BP
Blazingprojects
Read more →
Geophysics. 3 min read

Analysis of seismic data for reservoir characterization in an oil field....

The project titled "Analysis of seismic data for reservoir characterization in an oil field" aims to investigate and analyze the seismic data collecte...

BP
Blazingprojects
Read more →
Geophysics. 4 min read

Application of Machine Learning Algorithms in Seismic Data Analysis for Subsurface C...

The project titled "Application of Machine Learning Algorithms in Seismic Data Analysis for Subsurface Characterization" aims to explore the integrati...

BP
Blazingprojects
Read more →
Geophysics. 3 min read

Analysis of Seismic Data for Subsurface Characterization in a Tectonically Active Re...

The project titled "Analysis of Seismic Data for Subsurface Characterization in a Tectonically Active Region" aims to investigate the use of seismic d...

BP
Blazingprojects
Read more →
Geophysics. 2 min read

Application of Seismic Tomography for Subsurface Imaging and Characterization...

The project titled "Application of Seismic Tomography for Subsurface Imaging and Characterization" focuses on the utilization of seismic tomography as...

BP
Blazingprojects
Read more →
WhatsApp Click here to chat with us