Abstract
The design and construction of a fire alarm system in a two-storeyed building is of utmost importance to ensure the safety of occupants and the protection of property. This research project focuses on developing a comprehensive fire alarm system tailored to the specific needs of a two-storeyed building, considering factors such as building layout, occupancy type, and fire protection regulations. The project will begin with a detailed analysis of the building layout to identify key areas that require fire detection and alarm devices. Different types of sensors, such as smoke detectors, heat detectors, and flame detectors, will be strategically placed throughout the building to provide early detection of a potential fire. The selection of the appropriate sensors will be based on the nature of the occupancy and the potential fire risks present in the building. The construction of the fire alarm system will involve the installation of a centralized control panel that communicates with all the fire detection devices. The control panel will be programmed to trigger audible and visual alarms in the event of a fire, alerting occupants to evacuate the building immediately. Additionally, the system will be integrated with a monitoring service that will notify the local fire department automatically when a fire is detected. To ensure the reliability and effectiveness of the fire alarm system, regular maintenance and testing procedures will be implemented. Scheduled inspections of the system will be conducted to check for any faults or malfunctions, and necessary repairs or replacements will be carried out promptly. Training sessions will also be provided to building occupants on how to respond to a fire alarm and evacuate the building safely. Overall, the successful design and construction of a fire alarm system in a two-storeyed building require a thorough understanding of fire protection principles, building codes, and industry best practices. By implementing a customized fire alarm system that meets the specific needs of the building, the project aims to enhance the overall safety and security of the occupants and minimize the risk of property damage in the event of a fire.

Thesis Overview

1.0 INTRODUCTION
1.1 BACKGROUND OF PROBLEM

Fire detection system are safety system. They monitor rooms and buildings continuously for indication of fire outbreak and give alarm directly if one occurs.The industrial Electronics has changed the whole field ofEngineering and technology is occurring so rapidly, even indeveloping countries. It is so because newer technologies overcome older ones. After the industrial revolution the world directed towards the information age with the development of computers during the 1950’s.
As such, mechantronics which is a principle that combines theapplication of mechanical and electrical means has taken over thegreater part of industrial electronics which is indispensable in modern technology.
In Nigeria, security which is one of the basic lookouts in anyproductive firm has been on the decrease. Most industries have gone bankrupt because of their inability to meet up to the security standard required in a modern day setting. Equally, some homes and offices have lost important documents and properties due to easy access that criminals have. There is thus an urgent need for significant security measures to improve the standard of living of the people, enhance development and put to a stop the menace of insecurity. That is the reason as a student of Electrical/Electronics Engineering I decided to embark on a project named β€œMicrocontroller Based Multipurpose Security Device with Direction”.
This electronic system consists of four sensors made up of opto couplers realized with combination of Laser beam, from Laser diode coupled into a cadmium sulfide photocell (c.d.s photocell).
This component serves as an electronic eye, the output ofoptocouplers conditioned by a Schmitt trigger NAND gate controlLogic (74 Ls 132) TTL chip. The output of the 132 chips is sent intoport 0 of 8051 microcontroller. A keypad encoder containing eightkeys is interfaced to a port 1 of 8051 microcontroller. Anelectromagnetic relay driven by a Darlington pair transistor static switch is interfaced to the port 2 of the microcontroller. Servo motors that serve as the door prime mover is link to AC Circuit. Via the normally open contact of the electromagnetic relay. A buzzer is also interface to port 2 through a single transistor static switch.
Both the British Factory Acts 1961 and the officers shops and railway premises Acts 1963 stiputed minimum requirements in the case of fire that there shall be clear and audible warning throughout the building. Also, an earlier statutory requirement (section 36[7] of the factories Acts 1937) states that in any factory, hospitals, market places, homes etc. Where more than 20 persons are employed that place should be effective provision for giving warning signal in case of fire outbreak and that it shall be clearly audible throughout the building.

1.2 STRUCTURE OF THE PROBLEM

The alarm is given locally (visually and audibly) in order to mobilize internal auxiliary personal e.g the works fire brigade) and inform them as to the seat of the fire. A control center performs the organization of the alarm, that is, it makes available operational aids for the fire fighting measures and automatically bring the fire protection equipment into operation.


Blazingprojects Mobile App

πŸ“š Over 50,000 Research Thesis
πŸ“± 100% Offline: No internet needed
πŸ“ Over 98 Departments
πŸ” Thesis-to-Journal Publication
πŸŽ“ Undergraduate/Postgraduate Thesis
πŸ“₯ Instant Whatsapp/Email Delivery

Blazingprojects App

Related Research

Electrical electroni. 4 min read

Design and Implementation of Smart Grid Technology for Renewable Energy Integration ...

The project titled "Design and Implementation of Smart Grid Technology for Renewable Energy Integration in Microgrids" focuses on the development and ...

BP
Blazingprojects
Read more β†’
Electrical electroni. 2 min read

Design and implementation of an energy-efficient smart home system using IoT technol...

The project titled "Design and Implementation of an Energy-Efficient Smart Home System Using IoT Technology" focuses on the development of a cutting-e...

BP
Blazingprojects
Read more β†’
Electrical electroni. 2 min read

Design and implementation of a smart grid system for efficient energy management...

The project on the "Design and Implementation of a Smart Grid System for Efficient Energy Management" aims to address the growing need for sustainable...

BP
Blazingprojects
Read more β†’
Electrical electroni. 3 min read

Design and Implementation of a Smart Home Automation System Using Internet of Things...

The project titled "Design and Implementation of a Smart Home Automation System Using Internet of Things (IoT) Technology" aims to explore the integra...

BP
Blazingprojects
Read more β†’
Electrical electroni. 2 min read

Design and implementation of a smart home energy management system using Internet of...

The project titled "Design and implementation of a smart home energy management system using Internet of Things (IoT) technology" aims to address the ...

BP
Blazingprojects
Read more β†’
Electrical electroni. 2 min read

Design and implementation of real-time power monitoring system using IoT technology ...

The project titled "Design and Implementation of Real-Time Power Monitoring System Using IoT Technology for Smart Homes" focuses on the development of...

BP
Blazingprojects
Read more β†’
Electrical electroni. 4 min read

Design and Implementation of Power Factor Correction Circuit for Residential Applica...

The project on "Design and Implementation of Power Factor Correction Circuit for Residential Applications" aims to address the issue of power factor i...

BP
Blazingprojects
Read more β†’
Electrical electroni. 4 min read

Design and Implementation of a Smart Grid System Using IoT Technology in a Local Pow...

The project "Design and Implementation of a Smart Grid System Using IoT Technology in a Local Power Distribution Network" aims to revolutionize the tr...

BP
Blazingprojects
Read more β†’
Electrical electroni. 4 min read

Design and Implementation of an IoT-based Home Energy Management System...

The project titled "Design and Implementation of an IoT-based Home Energy Management System" aims to address the growing demand for efficient energy m...

BP
Blazingprojects
Read more β†’
WhatsApp Click here to chat with us