Title page
Certification /approval page
Dedication
Acknowledgement
Table of content
Chapter ONE
1.0 Introduction
1.1 Background
1.2 Aims and Objectives
1.3 Scope or Limitation
Chapter TWO
2.0 Literature Review
2.1 System Operation of Automatic Change over Switch
2.2 The Stand by Power Unit
2.3 Requirement for a Generator to be use on an Automatic Change over Switch
2.4 Fundamental Relay Operation
2.5 Definition of Operation and Feature
2.6 Time Delay Relay
2.7 Types of Construction for Timing Unit
2.8 Contactor Theory and Configuration
2.9 Contactor Mode of Operation
Chapter THREE
3.0 Construction
3.1 Circuit Diagram
3.2 Component and Key Symbols
3.3 Sequence of Operation
3.4 Testing and Result
3.5 The Packaging
OBSERVATION SUMMARY AND CONCLUSION
4.1 OBSERVATION
4.2 SUMMARY
4.2 SUGGESTIONS
4.3 CONCLUSION
Due to inconsistent supply of power, there is a growing need for an alternative source of power supply. This has lead to heavy capital investment in a bid to suppress power failure and ensure regular power supply for the industry, hospitals, schools and homes. The problem of power failure can be checkmated with the use of stand-by generating set.
An Engineering Author, “Tony Rudkin†said in his book titled “Upgraded Signal Source with Improved Performance and Reliability†that the cost and depredation associated with breakdown vary from one application to the other, and in some cases, the user has little choice but to ensure that a stand-by unit is available to take over on event of failure of primary system.
If some of these big firm do not make provisions for stand-by power source, frustration could set in which may lead to the closure of business and thus throwing workers into unemployment. Also in the case of hospital, undergoing a surgical operation and power supply suddenly go off, the patient might loose his or her life due to the power outage.
Furthermore, if the president of the country is making nationwide broadcast and all of a sudden power went off in the transmitting station, it would be viewed as an attempt to sabotage the government ruling and some people must pay for it.
📚 Over 50,000 Research Thesis
📱 100% Offline: No internet needed
📝 Over 98 Departments
🔍 Thesis-to-Journal Publication
🎓 Undergraduate/Postgraduate Thesis
📥 Instant Whatsapp/Email Delivery
The project titled "Design and Implementation of Smart Grid Technology for Renewable Energy Integration in Microgrids" focuses on the development and ...
The project titled "Design and Implementation of an Energy-Efficient Smart Home System Using IoT Technology" focuses on the development of a cutting-e...
The project on the "Design and Implementation of a Smart Grid System for Efficient Energy Management" aims to address the growing need for sustainable...
The project titled "Design and Implementation of a Smart Home Automation System Using Internet of Things (IoT) Technology" aims to explore the integra...
The project titled "Design and implementation of a smart home energy management system using Internet of Things (IoT) technology" aims to address the ...
The project titled "Design and Implementation of Real-Time Power Monitoring System Using IoT Technology for Smart Homes" focuses on the development of...
The project on "Design and Implementation of Power Factor Correction Circuit for Residential Applications" aims to address the issue of power factor i...
The project "Design and Implementation of a Smart Grid System Using IoT Technology in a Local Power Distribution Network" aims to revolutionize the tr...
The project titled "Design and Implementation of an IoT-based Home Energy Management System" aims to address the growing demand for efficient energy m...