Home / Architecture / Impact of materials management on project delivering in nigeria – architecture project topics – complete project material

Impact of materials management on project delivering in nigeria – architecture project topics – complete project material

 

Table Of Contents


Chapter ONE

1.1 Introduction
1.2 Background of Study
1.3 Problem Statement
1.4 Objective of Study
1.5 Limitation of Study
1.6 Scope of Study
1.7 Significance of Study
1.8 Structure of the Research
1.9 Definition of Terms

Chapter TWO

2.1 Materials Management in Projects
2.2 Importance of Materials Management
2.3 Challenges of Materials Management
2.4 Best Practices in Materials Management
2.5 Materials Management Strategies
2.6 Role of Materials Management in Project Delivery
2.7 Materials Procurement Process
2.8 Inventory Management in Projects
2.9 Technology in Materials Management
2.10 Sustainable Materials Management

Chapter THREE

3.1 Research Methodology Overview
3.2 Research Design
3.3 Data Collection Methods
3.4 Sampling Techniques
3.5 Data Analysis Techniques
3.6 Research Ethics
3.7 Validity and Reliability
3.8 Limitations of the Methodology

Chapter FOUR

4.1 Data Analysis and Interpretation
4.2 Overview of Findings
4.3 Impact of Materials Management on Project Delivery
4.4 Comparison of Different Materials Management Strategies
4.5 Case Studies on Successful Materials Management
4.6 Challenges Faced in Materials Management
4.7 Recommendations for Improvement
4.8 Future Research Directions

Chapter FIVE

5.1 Conclusion and Summary
5.2 Recap of Findings
5.3 Implications of the Study
5.4 Contributions to the Field
5.5 Recommendations for Practice
5.6 Suggestions for Further Research
5.7 Concluding Remarks
5.8 References

Thesis Abstract

Abstract
Materials management plays a crucial role in the successful delivery of construction projects in Nigeria. This research aims to investigate the impact of materials management on project delivery in the Nigerian architecture sector. The study will focus on various aspects of materials management such as procurement, storage, transportation, and utilization of materials in architectural projects. A mixed-methods approach will be utilized to gather data from both quantitative and qualitative sources. Surveys will be conducted among architects, project managers, contractors, and suppliers to assess their perspectives on materials management practices and their impact on project delivery. Additionally, interviews and site visits will be conducted to gather in-depth insights into the challenges and opportunities related to materials management in architecture projects in Nigeria. The findings of this research are expected to provide valuable insights into the current materials management practices in the Nigerian architecture sector and their effects on project delivery. By identifying the key challenges and opportunities in materials management, the study aims to suggest strategies and best practices that can enhance the efficiency and effectiveness of materials management in architectural projects in Nigeria. Ultimately, the research aims to contribute to the body of knowledge on materials management in construction projects, particularly in the context of the Nigerian architecture sector. The findings of this study are expected to be beneficial for architects, project managers, contractors, and suppliers involved in architectural projects in Nigeria, helping them improve their materials management practices and ultimately enhance project delivery outcomes.

Thesis Overview


1.1 BACKGROUND TO THE STUDY The Nigerian building and construction industry continues to occupy an important position in the nation’s economy even though it contributes less than the manufacturing or other service industries, (Aibinu and Jagboro, 2002). The contribution of the building and construction industry to national economic growth necessitates improved efficiency in the industry by means of cost effectiveness and timeliness, and would certainly contribute to cost savings for the country as a whole. It is also common knowledge that the implementation of the construction project in the industry is usually accompanied with poor quality delivery and delivery time delay and cost increase as well as owner dissatisfaction (Hafez, 2001). Thus, the efficient use and management of material have an importance influence on a company’s profit and can delay project construction (Abdul­ Rahman and Alidrisyi, 1993). The researchers will examine the impact of material management on project delivery in Nigeria.

Material management is a planned procedure that include, the purchasing, delivery, handling and minimization of waste with the aim of ensuring that requirement are met (Illingworth and Thain, 1998). According to Culvert (1998), a detailed material schedule and co-ordination of the requisition and order of material are important in assuring material availability. Efficient material planning is a key to high productivity on site. Material planning embraces quantifying, ordering and scheduling-. Productivity will suffer if the material planning process is not executed properly (Kaming, Olomolaiye, Holt and Harris, 1997).

Kwik (1994) stated that another issue (which is sometime beyond management control) is material shortages, for example yearly cement shortages have long been a topic of debate within the construction industry. Bell and Stukhart (1987) investigated a total concept for a Material Management System (MMS), which combined and integrated the take-off, vendor evaluation, purchasing expediting, and warehousing and distribution functions of material. The system resulted in improved labour productivity, reduced material surplus, reduced material management, manpower and cost saving. A1-Jibouri (2002) described a computer simulation model, which helps to solve the problem of order and deliveries of materials in real life by keeping a predetermined list of order and delivery time of all the materials on site. The delivery of each kind of material then takes place automatically at the specified time.

Ineffective materials management for projects can result in significant cost blow-outs and delays in project completion. Such cost inefficiencies will negatively impact global competitiveness, and owner operators and engineering, procurement, and construction companies are trying to streamline work processes for their projects. Inaccurate materials information, such as incorrect bills of materials, inaccurate cycle counts, shipping errors, receiving errors and so on, will also affect the overall project life cycle and increase project costs. Having to deal with subcontractors outside of the materials management process impacts the overall project supply chain as there is an increased risk of data inconsistencies.

Material management is the system for planning and controlling to ensure that the right quality and quantity of materials and equipment are specified in a timely manner. Materials should be obtained at a reasonable cost, and be available for use when needed. The cost of materials represents a large proportion of the cost. A good management system for materials management will lead to benefits for construction. Cash flow has become crucial for the survival of any business, if materials are purchased early, capital may be tied up and interest charges incurred on the excess inventory of material. Material may deteriorate during storage or be stolen; also delays and extra expense may be incurred if materials required for particular activities are not available.

Despite the importance of the materials, very little research has been directed towards understanding the management of materials from order to production; most research is focused upon the management of the design and procurement process and on labour site productivity. Materials management, which includes procurement, shop fabrication, logistics, supply chain management, production on site, and field servicing, requires special attention to achieve cost reduction. The supply chain is a convenient term used to describe a complex web of activities. The use of new equipment and innovative methods of materials handling has influenced changes in construction technologies in recent years.

Modern methods of material management have been embraced by the manufacturers across a wide range of industry sectors outside of construction.

1.2 STATEMENT OF THE PROBLEM Ogunlana and Proukumtong (1996) studied construction delays in a fast growing economy: comparing Thailand with Nigeria and some of the construction delays were attributed to material management: the study blames material shortage on site on unreliable supply from material suppliers occasioned by the general shortage in the industry, although there were specific instances in which poor communication between sites and head office purchasing, planning and co-ordination could be cited. However, much research has not be done on material management and project delivery in Nigeria considering the economic situation of Nigeria and the market full of substandard products. This study will therefore examine the impact of material management of project delivery in Nigeria in terms of quality and time.

1.3 OBJECTIVES OF THE STUDY The following are the objectives of this study:

To examine the impact of material management on project delivery time in Nigeria.
To examine the impact of material management on project quality upon delivery in Nigeria.
To determine the advantages and disadvantages of material management in project construction.
1.4 RESEARCH QUESTIONS

What is the impact of material management on project delivery time in Nigeria?
What is the impact of material management on project quality upon delivery in Nigeria?
What are the advantages and disadvantages of material management in project construction in Nigeria?
1.5 HYPOTHESIS HO: Material management does not affect project delivery in Nigeria HA: Material management does affect project delivery in Nigeria

1.6 SIGNIFICANCE OF THE STUDY This study will be of importance to building professionals and the general public because it would not only clarify but also create awareness of the extent to which inadequacies in material management can adversely affect project delivery. The study will also help contractors, clients, consultants and all parties involved in construction projects about ways of improving their current method of material management. This research will also serve as a resource base to other scholars and researchers interested in carrying out further research in this field subsequently, if applied will go to an extent to provide new explanation to the topic. 1.7 SCOPE/LIMITATIONS OF THE STUDY The scope of this study on impact of material management on project delivery in Nigeria will cover all the project construction in Nigeria looking at their level of adoption of material management approach considering their successes with respect to project delivery quality and time.

LIMITATION OF STUDY Financial constraint– Insufficient fund tends to impede the efficiency of the researcher in sourcing for the relevant materials, literature or information and in the process of data collection (internet, questionnaire and interview). Time constraint– The researcher will simultaneously engage in this study with other academic work. This consequently will cut down on the time devoted for the research work.

REFERENCES Abdul-Rahman,. H. and Alidrisyi, M. N. (1994) “A Perspective of Material Management Practices in a Fast Developing Economy; the case of Malaysia”. Construction Management and Economics, 12, 412-422. Aibinu A.A and Jagboro G.O (2002): “The Effects of Construction Delays on Projects Delivery in Nigeria Construction Industry”. International Journal of Project Management, 20, 593-599. Al-Jibouri, S. (2002): “Effects of Resource Management Techniques on Projects Schedules”. International Journal of Project Management, 20, 627-632 Kwik.K.G. (1994): “Cement and Its Problem in Indonesia”. Kompas October. 10 Illingworth, J. and Thain, K. (1998): “Material Management is it Worth It?” Technical Information Service, The Chartered Institute of Building ASCOT. 93, 1-5 Kaming, P.F, Olomolaiye, P. O., Holt, G.O. and Harris F.C. (1997): “Factors Influencing Construction Time and Cost Overruns on High-Rise Project in Indonesia”. Construction Management and Economics, 15, 83-94 Hafez, N (2001): “Residential Projects Obstacles and problems in Kuwait MS Project”, Department of Civil Engineering, Kuwait University. Culvert, O. (i998): “Correlates of time Overrun in Commercial Construction”. ASC Proceedings of the 40th Annual Conference. Brigham Young University, Provo, Utah, April 8-10.

Purchase Detail
Hello, we’re glad you stopped by, you can download the complete project materials to this project with Abstract, Chapters 1 – 5, References and Appendix (Questionaire, Charts, etc) for N5000 ($15) only,
Please call 08111770269 or +2348059541956 to place an order or use the whatsapp button below to chat us up.
Bank details are stated below.

Bank: UBA
Account No: 1021412898
Account Name: Starnet Innovations Limited

Blazingprojects Mobile App

📚 Over 50,000 Research Thesis
📱 100% Offline: No internet needed
📝 Over 98 Departments
🔍 Thesis-to-Journal Publication
🎓 Undergraduate/Postgraduate Thesis
📥 Instant Whatsapp/Email Delivery

Blazingprojects App

Related Research

Architecture. 3 min read

Exploring Sustainable Design Strategies for Urban Housing Development...

The project titled "Exploring Sustainable Design Strategies for Urban Housing Development" aims to investigate and analyze innovative design strategie...

BP
Blazingprojects
Read more →
Architecture. 2 min read

Exploring Sustainable Design Strategies in High-Rise Mixed-Use Developments...

The project titled "Exploring Sustainable Design Strategies in High-Rise Mixed-Use Developments" aims to investigate and analyze the application of su...

BP
Blazingprojects
Read more →
Architecture. 2 min read

Revitalization of Abandoned Industrial Sites Through Adaptive Reuse in Urban Setting...

The project titled "Revitalization of Abandoned Industrial Sites Through Adaptive Reuse in Urban Settings" aims to address the pressing issue of negle...

BP
Blazingprojects
Read more →
Architecture. 4 min read

Topic: Sustainable Design Strategies for Urban Affordable Housing Developments...

Research Overview: The project titled "Sustainable Design Strategies for Urban Affordable Housing Developments" aims to investigate and propose innov...

BP
Blazingprojects
Read more →
Architecture. 3 min read

Adaptive Reuse of Historic Buildings: A Sustainable Approach to Urban Regeneration...

The project titled "Adaptive Reuse of Historic Buildings: A Sustainable Approach to Urban Regeneration" aims to explore the potential of repurposing h...

BP
Blazingprojects
Read more →
Architecture. 2 min read

Design and Implementation of Sustainable Housing Solutions for Urban Slums...

The project titled "Design and Implementation of Sustainable Housing Solutions for Urban Slums" aims to address the critical issue of inadequate and u...

BP
Blazingprojects
Read more →
Architecture. 2 min read

Revitalization of Abandoned Industrial Sites Through Adaptive Reuse in Urban Environ...

The project titled "Revitalization of Abandoned Industrial Sites Through Adaptive Reuse in Urban Environments" aims to address the pressing issue of a...

BP
Blazingprojects
Read more →
Architecture. 2 min read

Implementing sustainable design principles in urban renewal projects...

The project titled "Implementing sustainable design principles in urban renewal projects" aims to explore the integration of sustainable design princi...

BP
Blazingprojects
Read more →
Architecture. 4 min read

Exploring Sustainable Design Strategies for Urban Housing Developments...

The project titled "Exploring Sustainable Design Strategies for Urban Housing Developments" aims to investigate innovative and sustainable design appr...

BP
Blazingprojects
Read more →
WhatsApp Click here to chat with us