Home / Petroleum engineering / An assessment of gravel packing methods used in the petroleum industry

An assessment of gravel packing methods used in the petroleum industry

 

Table Of Contents


Project Abstract

Project Overview

INTRODUCTION

Many reservoirs are comprised of relatively young sediments, which are so poorly consolidated that sand will be produced along with the reservoir fluids unless the production rate is reduced significantly. Sand production leads to many numerous production problems including erosion of down hole tubular, valves, fitting and surface flow lines, collapsed casing because of lack of formation support. Thus a means to eliminate sand production without greatly limiting production rates is desirable.

Sand production can be controlled using different methods but the method of utmost importance to this project is the mechanical method which basically involves the use of gravel pack (GRAVEL PACKING).

This method is considered the oldest and most effective sand   control mechanism. It is simply a down hole filter designed to prevent the production of unwanted sands which involves the placement of gravel across a perforated interval in the sand screen annulus and also in the perforation tunnel to prevent the influx of sand.

Inaccurate determination of gravel pack size, could lead to sand influx which could be detrimental to both the technical and economic aspect of production which is the overall objective of this project aimed at identifying means to selectively select appropriate gravel pack sizes from formation sands produced through sieve analysis to meet optimum sand control for maximum production without any detrimental effect to production hard wares.

In a gravel pack completion, sand that is larger than the average formation sand grain is placed between the formation and a screen or slotted liner with the aim of retaining most of the formation sand, but letting  very fine particles through it and be produced.

The two most common types of gravel pack completion are the inside casing gravel packing or internal gravel packing (IGP) and underreamed gravel pack or external gravel pack (EGP). The underreamed casing gravel pack provides better conductivity through the gravel but is limited to single zone completion.

1.1 AIMS AND OBJECTIVES

This project is aimed at

  1. To study   the various types of gravel packing methods used in the petroleum industry.
  2. To analyze sieve analysis data of formation sands gotten from OBEN13L in other to determine the appropriate gravel pack size used.
  3. To make conclusions on the state of OBEN WELL 13L on the basis of sieve data analysis and give possible recommendations.

1.2 SCOPE AND LIMITATION

The scope of this project is limited to the mechanical method of sand control with more emphasis on the sieve analysis of formation sands gotten from OBEN13L.

1.3 METHODOLOGY

The method to be adopted for this project is the use of sieve analysis and sucier correlation to determine the gravel pack size to be used for OBEN WELL 13 with formation sands gotten from the case study as mentioned above and useful information gotten from the internet, textbooks, petroleum journals. This method simply involves collecting core samples and running them through different sieves with different opening sizes, usually sieves with larger openings at the top and sieves of smaller opening at the bottom and plotting each weight retained on each sieve against the sieve opening size to determine the average formation sand size which is used to find accurate gravel size using  sucier correlation.


Blazingprojects Mobile App

📚 Over 50,000 Project Materials
📱 100% Offline: No internet needed
📝 Over 98 Departments
🔍 Software coding and Machine construction
🎓 Postgraduate/Undergraduate Research works
📥 Instant Whatsapp/Email Delivery

Blazingprojects App

Related Research

Petroleum engineerin. 3 min read

Enhanced Oil Recovery Techniques for Unconventional Reservoirs...

The project entitled "Enhanced Oil Recovery Techniques for Unconventional Reservoirs" focuses on exploring innovative methods to optimize oil recovery...

BP
Blazingprojects
Read more →
Petroleum engineerin. 4 min read

Optimization of Enhanced Oil Recovery Techniques for Mature Oilfields...

The project titled "Optimization of Enhanced Oil Recovery Techniques for Mature Oilfields" aims to address the challenge of declining oil production i...

BP
Blazingprojects
Read more →
Petroleum engineerin. 4 min read

Enhanced Oil Recovery Techniques for Mature Oil Fields...

Enhanced oil recovery (EOR) techniques play a crucial role in maximizing the extraction of oil from mature oil fields. As oil reserves become increasingly deple...

BP
Blazingprojects
Read more →
Petroleum engineerin. 2 min read

Investigation of Enhanced Oil Recovery Techniques in Mature Oil Fields....

The project on "Investigation of Enhanced Oil Recovery Techniques in Mature Oil Fields" aims to explore and evaluate various methods to enhance oil re...

BP
Blazingprojects
Read more →
Petroleum engineerin. 3 min read

Enhanced Oil Recovery Techniques for Unconventional Reservoirs...

Enhanced Oil Recovery Techniques for Unconventional Reservoirs"...

BP
Blazingprojects
Read more →
Petroleum engineerin. 4 min read

Optimization of Enhanced Oil Recovery Techniques in Mature Oilfields...

The project on "Optimization of Enhanced Oil Recovery Techniques in Mature Oilfields" aims to address the challenges faced in the oil and gas industry...

BP
Blazingprojects
Read more →
Petroleum engineerin. 3 min read

Enhanced Oil Recovery Techniques for Mature Oil Fields...

The project on "Enhanced Oil Recovery Techniques for Mature Oil Fields" focuses on addressing the challenges associated with extracting oil from matur...

BP
Blazingprojects
Read more →
Petroleum engineerin. 2 min read

Enhanced Oil Recovery Techniques for Mature Oil Fields...

"Enhanced Oil Recovery Techniques for Mature Oil Fields"...

BP
Blazingprojects
Read more →
Petroleum engineerin. 4 min read

Optimization of Hydraulic Fracturing Parameters for Enhanced Oil Recovery in Shale R...

The project, "Optimization of Hydraulic Fracturing Parameters for Enhanced Oil Recovery in Shale Reservoirs," aims to address the challenges associate...

BP
Blazingprojects
Read more →
WhatsApp Click here to chat with us