Home / Civil engineering / IMPACT OF THE 2007 PROCUREMENT ACT ON ACCOUNTABILITY OF OFFICERS IN THE PUBLIC SECTOR OF NIGERIA

IMPACT OF THE 2007 PROCUREMENT ACT ON ACCOUNTABILITY OF OFFICERS IN THE PUBLIC SECTOR OF NIGERIA

 

Table Of Contents


Chapter ONE

1.1 Introduction
1.2 Background of study
1.3 Problem Statement
1.4 Objective of study
1.5 Limitation of study
1.6 Scope of study
1.7 Significance of study
1.8 Structure of the research
1.9 Definition of terms

Chapter TWO

2.1 Overview of Procurement Acts
2.2 Accountability in the Public Sector
2.3 Theoretical Frameworks on Accountability
2.4 Impact of Legislation on Accountability
2.5 International Perspectives on Procurement Acts
2.6 Challenges in Implementing Procurement Acts
2.7 Best Practices in Accountability
2.8 Technology and Accountability
2.9 Case Studies on Procurement Acts
2.10 Future Trends in Procurement and Accountability

Chapter THREE

3.1 Research Design
3.2 Sampling Techniques
3.3 Data Collection Methods
3.4 Data Analysis Procedures
3.5 Ethical Considerations
3.6 Validity and Reliability
3.7 Limitations of Methodology
3.8 Research Tools and Instruments

Chapter FOUR

4.1 Overview of Data Findings
4.2 Analysis of Accountability Measures
4.3 Comparison of Pre and Post-Act Accountability
4.4 Stakeholder Perceptions on Accountability
4.5 Challenges in Implementing Accountability Measures
4.6 Success Stories in Accountability Improvement
4.7 Recommendations for Enhancing Accountability
4.8 Implications of Findings on Public Sector Governance

Chapter FIVE

5.1 Summary of Findings
5.2 Conclusions Drawn
5.3 Contributions to Existing Literature
5.4 Practical Implications
5.5 Recommendations for Future Research

Project Abstract

Abstract
The 2007 Procurement Act was a significant legislative development aimed at improving transparency, accountability, and efficiency in public sector procurement in Nigeria. This research project explores the impact of the 2007 Procurement Act on the accountability of officers in the public sector of Nigeria. The study employs a mixed-methods approach, combining quantitative analysis of procurement data and qualitative interviews with key stakeholders in the public sector. The findings indicate that the 2007 Procurement Act has had a positive impact on accountability in the public sector. The Act has established clear guidelines and procedures for procurement processes, reducing opportunities for corruption and ensuring that officers are held accountable for their actions. The introduction of electronic procurement systems has also increased transparency and efficiency in the procurement process. However, challenges remain in the implementation of the Act. Limited capacity and resources, as well as a lack of awareness and understanding of the Act among officers, have hindered its full effectiveness. There is a need for increased training and capacity-building initiatives to ensure that officers are fully equipped to comply with the provisions of the Act. Overall, the 2007 Procurement Act has been instrumental in improving the accountability of officers in the public sector of Nigeria. By establishing clear rules and procedures, promoting transparency, and increasing oversight, the Act has helped to curb corruption and promote good governance. Moving forward, continued efforts are needed to address implementation challenges and ensure that the full potential of the Act is realized in enhancing accountability in the public sector.

Project Overview

Background of the StudyThis study intends to shed more light on the impact of public procurement act on the accountability of procurement officers in public sector in Kaduna state ministry of education and how it contribute positively towards the conservation of resources in a services organization.However, the researcher feel it would be of great importance to conduct a detailed study on the procurement process or system used by the services organization and the impact of federal government procurement act on the accountability of procurement officers in the public sector.Base on wide spread corruption, conducting government business degenerated so much by the year 2000. This was due to the fact that no serious attention was paid to public service rule.Financial regulations ethics and norms because of selfish reasons. The federal government noted the urgent need to transparency in government procedure so as to be able to move the system forward. Hence, the federal government in 2000 commissioned the world bank to collaborate with some private sector specialist to study financial systems and general procurement related activities in the country. The essence of this request to the world bank is to assist Nigerian government with a process of enthroning efficiency, accountability, integrity and transparency in government procurement and financial management system.It was based on this that the country procurement assessment report was produced through a participatory review approach from key stakeholders including representative from private and the federal, state and local government with assistance from international and national consultants.Statement of the Problems A diagnostic study conducted in 2001 in to the state of federal government public procurement revealed that Nigeria may have lost trillions of naira over the last two decades because of flagrant abuse of procedures for the award of public contracts, inflation of contracts costs, lack of transparency, lack of competence based competition and merit as the fundamental criteria for the award of public contracts. The finding of the study made it imperative that the country urgently reform its procurements system, if the country is to reduce the large scale corruption and waste that had reduced the efficiency of the Nigeria public sectorMost organization lost a lot of money annually through all kind of manipulation of the procedure for the award of contracts and supply of materials.Ministries and government agencies has been facing difficulties in the award of contract due to lack of due process in the agencies.Federal government preferment act on the accountability of procurement officers in public sector is a vital tool in any fine-tuning organization either service or profit oriented organization. But it has been observed that its importance and role which can lead to efficiency had not yet been appreciated in most Nigeria ministries today.Objective of the StudyThe main rational of this study is to appraise the procurement act and its impact on the accountability of officers in public sector.These objectives are as follows:To evaluate the procurement act as it relates to providing fair opportunities to suppliers through bidding in a competitive environment for all government business.To evaluate the contributions /impact of the act towards reducing and eliminating corruption in the procurement process and earn the respect of the public and supplier.To examine the contribution of the act toward Quality control and assuranceTo evaluate the contributions of the procurement act towards budget monitoring and control.Significance of the StudyThe research work will critically concern with the impact of procurement act on the accountability of procurement officers in public sector which is essential things in the government ministries for the award of public contract. It is imperative to note that this research work will be beneficialThe importance of the research work base on its benefit, there will be ultimate to the organization itself and students of purchasing and supply department at large.Significantly the researcher hope that this research work will provide the organization with a meaningful and useful source of information in to guess to embark on procuring and award of contracts.Organization will benefit from the research finding and recommendation in the process of awarding contract and procurementsIt will also be useful to subsequent researcher and student who may wish to conduct further research in this field, it will served as data base for further study.It is a requirement in partial fulfillment for the award of a Higher National Diploma in Purchasing and Supply of Kaduna Polytechnic.Research QuestionsHow do the procurement act provide fair opportunity to suppliers in the competitive market environment.What are the impact of the procurement act towards reducing corruption in the award of public contract.What are the contribution of the procurement act of quality control and assurance.What are the relevance of procurement reforms act to subject monitoring and control.Scope of the StudyThis study does answer to all problems related to the federal government procurement act rather its limited to it chosen narrow area of accountability of procurement officers, its fairness, integrity and basis of effective control in public sectorSince the researcher is concerned with federal government procurement act on the accountability of procurement officers in the public sector particularly Kaduna state ministry of education.Definition of TermsThe terms used in the course of the researchers project are however defined as follows for easy understanding.Procurement: This is the acquisition of goods services or works from an external source.Procurement: Means acquisitionProcurement Proceeding: Means the initiation of the process of effecting a procurement up to award of procurement contract.Procurement entity: Means any public body engaged in procurement and it include a ministry extra-ministerial office, government agency, parastatals and corporation.Public procurement: Means the acquisition by any means of goods, works or services by the government.Public accountability: The obligations of public enterprises and agencies (who are entrusted with public resources) to be answerable for fiscal and social responsibilities, to them.Due process: It is a mechanism for ensuring strict compliance with the openness, completion and cost accuracy, rules and procedures that should guide contract award within the federal republic of Nigeria (BMPIU 2005)Relevant Authority: It includes economic and financial crimes commission (EFCC) and independent corrupt practices commission (ICPC).Public Procurement Act: It is the act enacted by the national assembly to establish two public procurement regulating authorities.

Blazingprojects Mobile App

📚 Over 50,000 Project Materials
📱 100% Offline: No internet needed
📝 Over 98 Departments
🔍 Software coding and Machine construction
🎓 Postgraduate/Undergraduate Research works
📥 Instant Whatsapp/Email Delivery

Blazingprojects App

Related Research

Civil engineering. 2 min read

Design and Analysis of a Sustainable High-rise Building Using Green Construction Tec...

The project topic "Design and Analysis of a Sustainable High-rise Building Using Green Construction Techniques" focuses on the innovative approach of ...

BP
Blazingprojects
Read more →
Civil engineering. 4 min read

Analysis and Design of Sustainable Green Building Structures using Bamboo as a Prima...

The project on "Analysis and Design of Sustainable Green Building Structures using Bamboo as a Primary Material" aims to explore the feasibility and b...

BP
Blazingprojects
Read more →
Civil engineering. 4 min read

Analysis and design of a sustainable stormwater management system for urban areas....

The project topic, "Analysis and design of a sustainable stormwater management system for urban areas," addresses the critical need for effective stor...

BP
Blazingprojects
Read more →
Civil engineering. 2 min read

Optimization of Reinforced Concrete Bridge Design for Enhanced Durability...

The project topic "Optimization of Reinforced Concrete Bridge Design for Enhanced Durability" focuses on improving the longevity and resilience of rei...

BP
Blazingprojects
Read more →
Civil engineering. 4 min read

Optimization of Reinforced Concrete Structures Using Advanced Computational Tools...

The project on "Optimization of Reinforced Concrete Structures Using Advanced Computational Tools" aims to enhance the design and analysis process of ...

BP
Blazingprojects
Read more →
Civil engineering. 2 min read

Design and Analysis of a Sustainable Urban Drainage System...

The project on "Design and Analysis of a Sustainable Urban Drainage System" aims to address the critical issue of urban drainage in modern cities. Urb...

BP
Blazingprojects
Read more →
Civil engineering. 3 min read

Enhancing the Durability of Concrete Structures through the Application of Advanced ...

The project topic, "Enhancing the Durability of Concrete Structures through the Application of Advanced Materials," focuses on improving the longevity...

BP
Blazingprojects
Read more →
Civil engineering. 4 min read

Analysis and Design of Sustainable Low-Carbon Building Materials for High-Rise Const...

The research project titled "Analysis and Design of Sustainable Low-Carbon Building Materials for High-Rise Construction" aims to address the growing ...

BP
Blazingprojects
Read more →
Civil engineering. 2 min read

Optimization of Concrete Mix Designs for Sustainable Construction Practices...

The project titled "Optimization of Concrete Mix Designs for Sustainable Construction Practices" aims to address the growing need for environmentally ...

BP
Blazingprojects
Read more →
WhatsApp Click here to chat with us